Skip to content
Back to search
45
MCP MCP 2025-11-25 streamable-http

io.github.theluckystrike/change-order

io.github.theluckystrike/change-order

Change orders against a quote or work order: deltas, approval, running contract value.

Watch this dependency Share evidence report
Uptime
100.0%
3 direct probes · 30d
Response
262ms
last probe
Tools
11
callable
Resources
2
readable
Prompts
2
available
Score: 45/100
The server exists but requires sign-in before we can list its tools.
partial Answers the MCP handshake 35/50
The endpoint answered HTTP 401 to an anonymous server/discover, so it exists, but we could not list its tools without credentials. It does advertise OAuth protected-resource metadata.
How to earn +15 points
Let anonymous clients discover what the server offers
Answer server/discover and tools/list without credentials and require auth only on tools/call. If the whole server must stay private, return a WWW-Authenticate header with resource_metadata pointing at /.well-known/oauth-protected-resource (RFC 9728) so MCP clients can sign in on their own; 2026-07-28 clients identify themselves with a Client ID Metadata Document rather than dynamic registration.
Docs →
n/a Lists tools, resources or prompts 0/30
Not scored: a catalogue only counts once the handshake succeeds.
n/a 3 or more catalogue items 0/10
Not scored: a catalogue only counts once the handshake succeeds.
pass Describes itself 10/10
86 characters; more than 30 earns these points.

Tools · 11

change_order_create

Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.

change_order_add_line

Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.

change_order_status

Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.

change_order_get

Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list f…

change_order_list

List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client,…

change_order_delete

Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number i…

contract_value

The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.

change_order_document

Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same te…

change_order_invoice_payload

Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.

license_status

Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing c…

license_activate

Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_…

Resources · 2

pricing

What change-order costs, what Pro unlocks, the checkout link that carries this connection's token, and the one step a person has to take. Machine-readable; read it before telling a user how to lift a …

pricing://change-order
contract

The five statuses and the legal moves, how the running value is built, the two payload scales, the free-tier limits and the one document this server writes.

changeorder://contract

Prompts · 2

upgrade_to_pro

Explain what Pro on the change-order server costs and exactly what the user has to do, without leaving the conversation.

agree_the_change

Record what changed against a quote or work order, send it, record the client's answer, and build the invoice payload for the approved delta.

How to use

Claude Desktop or claude.ai: add a custom connector (Customize → Connectors; on Team and Enterprise plans an owner adds it under Organization settings → Connectors) with this server URL: https://mcp.zovo.one/mcp/change-order

Cursor or Cline: add to your MCP config:

{
  "mcpServers": {
    "io.github.theluckystrike/change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order",
      "transport": "streamable-http"
    }
  }
}