Skip to content
Back to search
100
MCP live MCP 2025-06-18 streamable-http

fr.synergieloc/immobilier

fr.synergieloc/immobilier

Draw buildings as DXF, IFC and 3D, plus exact French rent and charges calculations.

Watch this dependency Share evidence report
Uptime
100.0%
5 direct probes · 30d
Response
740ms
last probe
Tools
558
callable
Resources
0
readable
Prompts
0
available
Score: 100/100
Handshake verified by our own probe.
pass Answers the MCP handshake 50/50
The handshake and the list calls succeeded on the primary URL.
pass Lists tools, resources or prompts 30/30
558 tools, 0 resources, 0 prompts returned.
pass 3 or more catalogue items 10/10
558 items in total; 3 or more earns these points.
pass Describes itself 10/10
83 characters; more than 30 earns these points.

Tools · 558

cao_bim_conformite

Appelez quand vous devez etablir le bilan BIM consolide d'une scene CAO (LOD/LOI, completude, conformite, nommage, disciplines, quantitatif) pour une phase donnee. Renvoie un score 0-100, le verdict e…

cao_bim_aller_retour

Appelez quand vous devez verifier l'aller-retour IFC complet d'une scene CAO : exporte en IFC4 (ifcopenshell), reimporte et compare semantiquement. Garantit qu'aucun element n'est perdu ni deplace de …

cao_bim_disciplines

Appelez quand vous devez attribuer chaque element d'une scene CAO a sa discipline (architecture, structure, MEP, electricite, plomberie, CVC, paysage, voirie), donne l'effectif par discipline et la ma…

cao_bim_modele

Appelez quand vous devez construire le modele semantique BIM d'une scene CAO (identifiants stables, niveau, dimensions, materiau, libelle) et verifie l'aller-retour JSON sans perte. Lecture seule, san…

cao_bim_familles

Appelez quand vous devez lister les familles parametriques standard (action=standard, defaut), lister les familles data-driven avec catalogue de types fabricants (action=parametrique), evaluer une fam…

cao_bim_doe

Appelez quand vous devez produire la documentation fine de fin de chantier (DOE) : fiches de local (action=fiches, defaut), nomenclature des finitions avec totaux par materiau (action=finitions) ou so…

cao_bim_federation

Appelez quand vous devez federer plusieurs modeles ou batiments d'un grand projet (worksharing) : relie chaque modele a sa discipline, detecte les elements dupliques et les collisions de noms, synchro…

cao_bim_fabricants

Appelez quand vous devez consulter ou etendre le catalogue de familles fabricants (menuiseries, sanitaires, chauffage, ventilation, electricite, structure, cloison_isolation) : stats (action=stats, de…

cao_bim_dtu

Appelez quand vous devez verifier la conformite d'une scene aux normes d'execution francaises (DTU) : epaisseurs des murs cloison/porteur (DTU 20.1), alleges et appuis des fenetres (DTU 36.5), garde-c…

cao_bim_sismique

Appelez quand vous devez predimensionner un batiment au seisme (Eurocode 8, indicatif) : zonage sismique FR (1-5), spectre de reponse elastique, periode T1, effort tranchant a la base par la methode d…

cao_bim_options

Appelez quand vous devez comparer des options de conception (variantes A/B) d'un projet : chaque variante est une scene nommee, et la comparaison est CALCULEE (quantitatif, cout 5D, delai 4D pondere p…

cao_bim_terrain

Appelez quand vous devez analyser un terrain et son terrassement depuis des points topographiques : pente moyenne et maximale (plan ajuste), volumes de deblai/remblai pour une plateforme, altitude qui…

cao_bim_cctp

Appelez quand vous devez rediger le CCTP (cahier des clauses techniques particulieres) d'une scene : les 11 lots du marche (gros oeuvre, charpente, menuiseries, platerie, electricite, plomberie, chauf…

cao_bim_reception

Appelez quand vous devez produire les reserves et le PV de reception d'une scene : les ecarts DTU deviennent des reserves numerotees rattachees a leur lot, les reserves se levent avec preuve (levee_id…

cao_bim_portfolio

Appelez quand vous devez consolider PLUSIEURS projets BIM en un portefeuille (vue bureau d'etudes) : statistiques (score moyen, cout total, prets/bloques, a signer), lignes par projet et classement (l…

cao_bim_maintenance

Appelez quand vous devez produire le carnet d'entretien (exploitation) d'une scene : chaque equipement (chaudiere, PAC, VMC, chauffe-eau, climatiseur, ascenseur...) recoit sa periodicite d'entretien e…

cao_bim_lod

Appelez quand vous devez evaluer le niveau de developpement (LOD) et d'information (LOI) de chaque element d'une scene CAO, et le valide contre la phase du projet (esquisse, aps, apd, dce, execution).…

cao_bim_cde

Appelez quand vous devez decrire l'environnement de donnees commun (CDE, ISO 19650) : machine d'etats brouillon -> soumis -> approuve/rejete -> remplace, transitions gardees, et deroule un cycle de vi…

cao_bim_livraison

Appelez quand vous devez decider de la livraison BIM (BIM Execution Plan) : verifie que la maquette atteint le LOD/LOI, la completude, le nommage et la conformite exiges par la phase (esquisse/aps/apd…

cao_bim_bcf

Appelez quand vous devez generer des issues BCF (BIM Collaboration Format 2.1) depuis les ecarts de l'aller-retour IFC d'une scene (action par defaut : scene + markup XML pret pour Solibri/BIMcollab),…

cao_bim_reglementations

Appelez quand vous devez controler la conformite d'une scene CAO selon la reglementation du TERRAIN du projet (France, Etats-Unis IBC/ADA, Suisse SIA 500, Royaume-Uni Approved Documents). Verifie esca…

cao_bim_projet

Appelez quand vous devez obtenir la vue projet complete selon le TERRAIN : reglementation applicable (FR/USA/CH/GB), verdict de conformite, bilan BIM, decision de porte et manifeste des livrables — ou…

cao_bim_4d5d

Appelez quand vous devez estimer le cout (5D) et le planning de construction (4D) d'une scene CAO : quantitatif x taux unitaires, taches filtrees par phase BEP (action=bilan, defaut), la COURBE EN S d…

cao_bim_mep

Appelez quand vous devez verifier ou dimensionner un systeme MEP : connectivite et dimensionnement d'un reseau (action=reseau, defaut), debits cumules calcules d'un reseau hydraulique (action=debits, …

cao_bim_structure

Appelez quand vous devez obtenir un ordre de grandeur de calcul structure (EC2 simplifie) : poutre, dalle, poteau, effort tranchant, flexion composee, flambement, moment de dalle bidirectionnelle (mom…

cao_bim_energie

Appelez quand vous devez estimer la valeur U (W/m2K) d'une paroi composee, les deperditions, le bilan thermique, le Cep, le Bbio — ou l'ETIQUETTE DPE 2021 (A-G) d'un logement : donnez cep_kwh_m2 + ges…

cao_bim_acv

Appelez quand vous devez estimer le CARBONE de la construction (ACV) d'une scene : quantites lues dans la maquette (murs, dalles/planchers, couvertures, menuiseries) x facteurs d'emission FDES/INIES, …

cao_bim_incendie

Appelez quand vous devez verifier la SECURITE INCENDIE d'une scene (habitation ou ERP) : distances d'evacuation (10 m habitation / 40 m ERP, code du travail R. 4216-2), nombre d'issues selon l'effecti…

cao_bim_accessibilite

Appelez quand vous devez auditer l'ACCESSIBILITE PMR d'une scene (ERP, bureaux ou habitation ADAP) : portes d'entree >= 0,90 m (0,83 habitation), cheminements >= 1,20 m avec pentes <= 5 % et ressauts …

cao_bim_acoustique

Appelez quand vous devez verifier l'ACOUSTIQUE d'une scene contre la NRA (arrete 30/06/1999) : bruits aeriens entre logements (DnT,A >= 53 dB), bruits de choc (L'nT,w <= 58 dB), bruits d'equipements (…

cao_bim_economie_circulaire

Appelez quand vous devez produire le diagnostic PEMD (Produits-Equipements-Materiaux-Dechets, loi AGEC / decret PMCB) d'une scene avant demolition ou rehabilitation : masses par materiau, filieres (re…

cao_bim_eclairage

Appelez quand vous devez verifier l'ECLAIRAGE NATUREL (FLJ) d'une scene : surface vitree >= 1/6 de la surface de chaque piece (reglement sanitaire / RE2020) et FLJ estime >= 2 % (EN 17037 / code du tr…

cao_bim_descente_charges

Appelez quand vous devez descendre les charges d'une scene jusqu'au sol et verifier les fondations : poids propres (dalles 25 kN/m3, murs par materiau), charges d'exploitation par usage (EC1-1-1 : hab…

cao_bim_vent

Appelez quand vous devez estimer les CHARGES DE VENT sur un batiment (Eurocode 1-1-4, indicatif) : pression dynamique de pointe qp(z) selon la region (vitesse de base 22-28 m/s) et la categorie de ter…

cao_bim_grue

Appelez quand vous devez choisir la GRUE DE CHANTIER et verifier ses levages depuis la maquette : portee couvrant l'emprise + 2 m, chaque levage (masse_kg, position x/y) dans la portee ET dans la cour…

cao_bim_securite_chantier

Appelez quand vous devez verifier la SECURITE DU CHANTIER (PPSPS, indicatif) : protections collectives contre les chutes (garde-corps provisoires/filets sur dalles et toitures en travaux, tremies obtu…

cao_bim_eaux_pluviales

Appelez quand vous devez dimensionner la GESTION DES EAUX PLUVIALES d'une parcelle : surface active (toitures, voiries, espaces verts x coefficients de ruissellement), volume de retention requis par l…

cao_bim_biotope

Appelez quand vous devez verifier la BIODIVERSITE d'une parcelle (coefficient de biotope du PLU) : CBS = somme(surfaces eco-amenageables x coefficient) / parcelle, avec pleine terre 1,0 / espaces vert…

cao_bim_confort_ete

Appelez quand vous devez verifier le CONFORT D'ETE (surchauffe, RE2020) d'une scene : protections solaires sur les baies sud/ouest >= 1 m2 (bso/casquette/volet declares), inertie (dalle beton >= 12 cm…

cao_bim_geotechnique

Appelez quand vous devez choisir le SYSTEME DE FONDATION d'un batiment : la descente de charges (N ELU, murs porteurs) est confrontee au sol (capacite admissible, argile, remblai) et le systeme est re…

cao_bim_etancheite

Appelez quand vous devez verifier l'ETANCHEITE A L'AIR (RE2020) d'un batiment : Q4Pa-surf <= 0,6 m3/(h.m2) maison / 1,0 collectif, points singuliers traites (menuiseries, traversees, trappes, gaines, …

cao_bim_ratios

Appelez quand vous voulez le TABLEAU DE BORD DE CONCEPTION d'une scene : SHAB, emprise et CES (emprise/parcelle <= 0,40), hauteur, surface deperditive et compacite (<= 1,2), ratio de vitrage (entre 1/…

cao_bim_worksharing

Appelez quand PLUSIEURS acteurs doivent travailler sur la MEME maquette (worksharing) : creer une session (jeton + version), joindre, verrouiller/deverrouiller des elements, modifier avec detection de…

cao_bim_placer

Appelez quand vous devez POSER un type du catalogue fabricants DANS la maquette (auteur) : placer(scene, famille, type, x/y/z) ajoute l'element dans le bon conteneur (ouvertures, murs, boites, poteaux…

cao_bim_exe

Appelez quand vous devez produire le DOSSIER EXE MULTI-LOTS d'une scene : decoupage en 9 lots d'execution (gros oeuvre, charpente/couverture, menuiseries, cloisons, electricite, plomberie, CVC, sols, …

cao_bim_mep_dimensionnement

Appelez quand vous devez DIMENSIONNER LES DIAMETRES d'un reseau MEP : chaque troncon d'eau recoit le DN standard (12->110) par la methode des vitesses (0,4-1,5 m/s confort, 2,5 m/s limite) sur son deb…

cao_bim_bordereau_armatures

Appelez quand vous devez produire le BORDEREAU D'ARMATURES (livrable ferrailleur) d'une scene : les barres declarees (element + barres [{diametre_mm, forme: droit|u|cadre|chapeau, quantite, dims}]) re…

cao_bim_planning_cpm

Appelez quand vous devez ordonnancer le chantier par la METHODE DU CHEMIN CRITIQUE (4D avance) : debut/fin au plus tot et au plus tard (ES/EF/LS/LF), marges, chemin critique (taches a marge nulle), de…

cao_bim_dossier_complet

Appelez quand vous voulez LE DOSSIER DCE COMPLET en un appel : le dossier historique (reglementation, bilan, gate, DTU, sismique, cout, planning, courbe en S, CCTP, terrain, note) PLUS toutes les piec…

cao_bim_assurances

Appelez quand vous devez verifier les ASSURANCES OBLIGATOIRES de la construction : dommages-ouvrage souscrite AVANT l'ouverture du chantier (code des assurances L. 242-1), garantie decennale et RC pro…

cao_bim_cvc

Appelez quand vous devez dimensionner le GENERATEUR CVC : puissance de chauffage requise (deperditions statiques U.S.dT + marge de relance 1,2), choix du plus petit appareil du catalogue (PAC air/eau …

cao_bim_eclairage_artificiel

Appelez quand vous devez verifier l'ECLAIRAGE ARTIFICIEL d'une scene : chaque piece contre le niveau requis par son usage (code du travail R. 4223-4 / EN 12464 — bureaux 300 lux, circulations 40, stoc…

cao_bim_volumes_eau

Appelez quand vous devez verifier la SECURITE ELECTRIQUE DES SALLES D'EAU (NF C 15-100) : chaque appareil declare est classe dans son volume (0 baignoire/douche IPX7, 1 jusqu'a 2,25 m IPX4, 2 autour 0…

cao_bim_gaz

Appelez quand vous devez verifier la SECURITE GAZ d'une installation (arrete 2/08/1977, DTU 61.1) : ventilation du local chaudiere (amenee d'air basse >= 50 cm2 + evacuation haute >= 100 cm2), debouch…

cao_bim_ascenseur

Appelez quand vous devez verifier un ASCENSEUR (EN 81, arrete 20/04/2017) : gaine >= dimensions de la capacite (630 kg : 1,50 x 1,50 m ; 1000 kg : 1,90 x 1,90), fosse >= 1,10 m (1,20 pour 800-1000 kg)…

cao_bim_qai

Appelez quand vous devez verifier la QUALITE DE L'AIR et les debits de ventilation d'un logement : debits d'extraction par local selon la taille (arrete 24/03/1982 — cuisine 45->135 m3/h, SDB 15->60, …

cao_bim_charpente

Appelez quand vous devez dimensionner la CHARPENTE BOIS (EC5/DTU 31.1) : chevrons et pannes sur appuis simples — charge lineaire (couverture 0,8 kN/m2 + neige 0,45) x entraxe, moment de flexion, contr…

cao_bim_mep_aeraulique

Appelez quand vous devez dimensionner le RESEAU DE GAINES COMPLET : debits des bouches cumules de l'aval vers la source, diametre normalise de chaque troncon par la friction constante (1 Pa/m), perte …

cao_bim_4d_cpm

Appelez quand vous voulez la COURBE EN S DATEES par le chemin critique (4D avance) : chaque tache du CPM recoit ses dates reelles (ES/EF), le cout 5D est reparti par poids de tache (terrassement 5 %, …

cao_bim_vrd

Appelez quand vous devez verifier les VRD (voiries et reseaux divers) d'une scene : pentes de voirie entre 0,5 et 15 %, regards au moins tous les 30 m et a chaque changement de direction, branchements…

cao_bim_evacuation

Appelez quand vous devez verifier l'EVACUATION d'un batiment : issues signalees (pictogrammes eclaires), BAES (>= 1 par issue + 1 par niveau), plan d'evacuation affiche a chaque niveau, issues degagee…

cao_bim_certification

Appelez quand vous voulez le SCORECARD DE CERTIFICATION ENVIRONNEMENTALE (HQE/BREEAM-like) d'une scene : 4 familles (energie-carbone : etancheite, confort d'ete, carbone ACV ; environnement-eau : biot…

cao_bim_eau

Appelez quand vous devez verifier la CONSOMMATION D'EAU POTABLE d'un logement : estimation annuelle (120 L/j/occupant, -20 % avec appareils economes — chasse 3/6 L, mousseurs), recuperation d'eau de p…

cao_bim_toiture_terrasse

Appelez quand vous devez verifier une TOITURE-TERRASSE (NF DTU 43) : pente de la partie courante entre 1 et 5 %, releves d'etancheite >= 150 mm au-dessus du niveau fini, evacuations EP (>= 2, diametre…

cao_bim_vitrages

Appelez quand vous devez verifier les VITRAGES DE SECURITE (NF DTU 39 / NF P78) : vitrages en allege (bas < 1,00 m, chute > 1 m -> feuillete 44.2), portes vitrees pleine hauteur (feuillete 44.2 ou tre…

cao_bim_condensation

Appelez quand vous devez verifier le RISQUE DE CONDENSATION d'une paroi (methode de Glaser, NF EN ISO 13788) : profil de temperature et de pression de vapeur a travers les couches declarees (materiau,…

cao_bim_bardage

Appelez quand vous devez verifier un BARDAGE RAPPORTE (regles professionnelles) : lame d'air ventilee >= 20 mm, pare-pluie HPV declare, ossature (bois/alu) et fixations (espacement <= 600 mm), jeu en …

cao_bim_lod_instances

Appelez quand vous devez verifier le LOD/LOI D'EXECUTION des instances posees : chaque instance atteint LOD 350 (dimensions nominales), 400 (+ position) ou 500 (fabricant + reference, tel que construi…

cao_bim_bordereau_lots

Appelez quand vous voulez les BORDEREAUX QUANTITATIFS EXE par lot (unites d'oeuvre d'agence) : beton m3 (murs banches, dalles), COFFRAGE m2 (sous-faces + rives de dalles, 2 faces des murs), acier kg (…

cao_bim_foudre

Appelez quand vous devez verifier la PROTECTION FOUDRE (NF EN 62305) : analyse du risque annuel (Ng x surface equivalente 9πH2 x environnement x usage), paratonnerre (PDA ou cage maillee) requis si ri…

cao_bim_soutenement

Appelez quand vous devez verifier un MUR DE SOUTENEMENT (Rankine, EC7) : poussee active des terres (Ka = tan2(45-phi/2), avec surcharge), securite au GLISSEMENT (mu x poids / poussee >= 1,5) et au REN…

cao_bim_diagnostics

Appelez quand vous devez verifier les DIAGNOSTICS OBLIGATOIRES AVANT TRAVAUX : DTA amiante (batiment d'avant 1997, valable 6 ans, diagnostiqueur certifie), CREP plomb (avant 1949, a actualiser si plom…

cao_bim_intrusion

Appelez quand vous devez verifier la SECURITE INTRUSION (EN 1627 / NF A2P) : classification des acces (porte d'entree et fenetres accessibles >= RC2), alarme certifiee NF A2P pour les locaux sensibles…

cao_bim_sprinkler

Appelez quand vous devez verifier un SPRINKLAGE (regles APSAD, indicatif) : necessite (entrepot/commerce/industrie > 3 000 m2 ou ERP 1re-2e categorie), reserve d'eau >= densite de la classe de risque …

cao_bim_signaletique

Appelez quand vous devez verifier la SIGNALETIQUE PMR (arrete 20/04/2017) : pictogrammes d'accessibilite (sourds/malentendants) aux accueils sonorises, bandes podotactiles d'eveil de vigilance en haut…

cao_bim_vibrations

Appelez quand vous devez verifier le CONFORT VIBRATOIRE d'un plancher (EC5) : frequence propre estimee f1 ~ 18/racine(delta) (delta = fleche sous charge permanente), exigence >= 8 Hz en residentiel, f…

cao_bim_legionelles

Appelez quand vous devez verifier la PREVENTION LEGIONELLES d'un reseau ECS collectif (arretes 30/11/2005 et 1/02/2010) : temperature de stockage >= 55 C, bouclage avec retour >= 50 C, purge de fond d…

cao_bim_eclairage_exterieur

Appelez quand vous devez verifier l'ECLAIRAGE EXTERIEUR (EN 12464-2, arrete 27/12/2018) : niveaux par zone (parking 20 lux, cheminement 10, acces 30), uniformite parking >= 0,25, densite de puissance …

cao_bim_aev

Appelez quand vous devez verifier le CLASSEMENT AEV des menuiseries (NF DTU 36.5) : classement A*E*V* (air/eau/vent) >= exigence de l'exposition (faible A2E3V2, moderee A3E5V2, forte A4E6V3), expositi…

cao_bim_emergence_sonore

Appelez quand vous devez verifier l'EMERGENCE SONORE des equipements exterieurs (PAC, clim, VMC — code de la sante R. 1334-31) : niveau a la limite de propriete Lp = Lw - 20.log(d) - 11 (ecran -5 dB),…

cao_bim_parking

Appelez quand vous devez verifier un PARKING : dimensions des places (standard >= 2,30 x 5,00 m, PMR >= 3,30 x 5,00), largeur des allees (double sens >= 5,50 m, sens unique >= 3,50), ventilation mecan…

cao_bim_suivi_energetique

Appelez quand vous devez verifier le SUIVI ENERGETIQUE d'un batiment (exploitation) : plan de comptage par usage (chauffage, ECS, eclairage, prises, auxiliaires), DERIVE entre consommation mesuree et …

cao_bim_cuisine_pro

Appelez quand vous devez verifier une CUISINE PROFESSIONNELLE : extraction de la hotte >= 30 m3/h par kW installe, compensation d'air entre 80 et 90 % de l'extraction (legere depression), filtres a gr…

cao_bim_bruit_chantier

Appelez quand vous devez verifier le BRUIT DE CHANTIER au voisinage : niveau au riverain depuis les engins declares (Lw, distance, ecran -5 dB), limites indicatives 70 dB(A) jour / 60 nuit, emergence …

cao_bim_niveaux

Appelez quand vous devez organiser la maquette par NIVEAUX (etages, a la Revit) : creer des niveaux nommes avec leur altitude (action=creer, nom, z_mm), les lister (action=niveaux), PLACER une instanc…

cao_bim_reservations

Appelez quand vous devez verifier les RESERVATIONS ENTRE LOTS (coordination EXE) : statut de chaque reservation (tremie, fourreau, reservation) avant coulage (alerte a J-7), chevauchements entre reser…

cao_bim_eau_froide

Appelez quand vous devez verifier le RESEAU D'EAU FROIDE SANITAIRE : temperature de distribution <= 25 C (arrete qualite de l'eau), gaines mitoyennes de reseaux chauds isolees, protection hors gel des…

cao_bim_registre_securite

Appelez quand vous devez verifier le REGISTRE DE SECURITE (exploitation) : les equipements presents dans la scene (extincteurs, BAES, ascenseurs, sprinkler, gaz, paratonnerre, alarme intrusion) sont d…

cao_bim_desenfumage

Appelez quand vous devez verifier le DESENFUMAGE (ERP CO 43, IT 246) : systeme requis pour les locaux > 300 m2 (cat. 1-4) ou > 100 m2 (5e cat.), surface utile d'exutoires >= 1/200 de la surface du loc…

cao_bim_renovation

Appelez quand vous devez construire le PAQUET DE RENOVATION ENERGETIQUE : Cep apres travaux (gains par poste : combles, murs, menuiseries, ventilation, chauffage), cible BBC renovation (<= 100 kWh/m2)…

cao_bim_reverberation

Appelez quand vous devez verifier la CORRECTION ACOUSTIQUE d'une salle : temps de reverberation TR60 par la formule de Sabine (TR = 0,16 V / somme S*alpha), cible par usage (bureau 0,6 s, reunion 0,8 …

cao_bim_structure_scene

Appelez quand vous devez PREDIMENSIONNER TOUTE LA STRUCTURE d'une scene CAO d'un coup : dalles (epaisseur >= portee / 30), poteaux (elancement lambda = Lf/i <= 70), poutres (h >= L/15 et b >= 0,3 h), …

cao_bim_pieces_equipees

Appelez quand vous devez EQUIPER LES PIECES SELON LEUR USAGE depuis le catalogue fabricants : composition du kit minimum par piece (cuisine : evier, extraction, eclairage ; salle de bain : WC suspendu…

cao_bim_calepinage

Appelez quand vous devez CALEPINER LES REVETEMENTS (plan de pose EXE) : rangées entieres et carreaux coupes par piece, nombre de carreaux a acheter, dechet (%) face aux regles de l'art — dechet <= 10 …

cao_bim_coupes

Appelez quand vous devez COUPER LA MAQUETTE (auteur) : coupe verticale a x fixe ou y fixe listant les elements traverses (murs, poteaux, dalles) avec leurs altitudes, hauteurs libres de plancher a pla…

cao_bim_referencement_fabricants

Appelez quand vous devez REFERENCER LES MENUISERIES sur le catalogue fabricants (EXE) : attribue a chaque ouverture le type fabricant le plus proche (fenetre PVC/alu/bois par gabarit, porte interieure…

cao_bim_planchers

Appelez quand vous devez PREDIMENSIONNER LES PLANCHERS (structure) : systeme declare (hourdis, dalle_pleine, bois), portee admissible (7 m hourdis, 8 m dalle, 5 m bois), epaisseur minimale (160 mm hou…

cao_bim_reperage_lots

Appelez quand vous devez REPERER LES ELEMENTS PAR LOT pour les plans d'execution (EXE) : codifie chaque element de la maquette par lot (GO-MUR-01, ME-OUV-03, PL-RES-02), puis verifie — chaque conteneu…

cao_bim_neige

Appelez quand vous devez CALCULER LA CHARGE DE NEIGE sur une toiture (EC1-1-3) : zone francaise (1A a 5, sk au sol), pente de toiture (coefficient de forme mu : 0,8 <= 30 deg, lineaire 30-60, 0 >= 60)…

cao_bim_pose_niveaux

Appelez quand vous devez REPARTIR LES EQUIPEMENTS FABRICANTS PAR NIVEAU (auteur) : chaque piece est rattachee a son niveau, son kit fabricant est resolu (cuisine, salle de bain, chambre...), et le pla…

cao_bim_linteaux

Appelez quand vous devez PREDIMENSIONNER LES LINTEAUX au-dessus des ouvertures (structure) : hauteur >= portee / 10 (LIN-HAUTEUR), appuis >= 20 cm de chaque cote (DTU 20.1, LIN-APPUIS), charge reprise…

cao_bim_points_arret

Appelez quand vous devez GERER LES POINTS D'ARRET DU CHANTIER (EXE / PAQ) : registre des points d'arret (PA) et points critiques (PC) par lot (implantation, fondations, ferraillage, coulage, etancheit…

cao_bim_pose_menuiseries

Appelez quand vous devez VERIFIER LA POSE DES MENUISERIES EXTERIEURES (DTU 36.5) : jeu peripherique de calage 5-10 mm (PM-JEU), seuil <= 20 mm PMR (PM-SEUIL), entraxe des pattes de fixation <= 600 mm …

cao_bim_details_exe

Appelez quand vous devez CONSTITUER LE CARNET DE DETAILS D'EXECUTION (auteur / EXE) : chaque point singulier de la maquette (jonction mur-dalle, seuil de porte, appui de fenetre, acrotere, rive de toi…

cao_bim_noeuds

Appelez quand vous devez VERIFIER LES NOEUDS POTEAU-POUTRE (structure EC8) : zone critique du poteau >= max(section, 450 mm) (NEU-ZONE-CRITIQUE), attentes Ø >= 12 mm avec recouvrement >= 40 Ø (NEU-ATI…

cao_bim_equilibrage

Appelez quand vous devez VERIFIER L'EQUILIBRAGE AERAULIQUE (MEP) : chaque local declare soufflage et reprise > 0 (EQU-DECLARATION), desequilibre local <= 10 % (EQU-EQUILIBRE-LOCAL), desequilibre globa…

cao_bim_ponts_thermiques

Appelez quand vous devez VERIFIER LES PONTS THERMIQUES de l'enveloppe (RE2020) : liaisons declarees (plancher/mur, mur/refend, menuiserie, acrotere, balcon, toiture) avec coefficient Ψ (W/mK), confron…

cao_bim_circuits_electriques

Appelez quand vous devez VERIFIER LES CIRCUITS ELECTRIQUES (NF C 15-100) : calibre du disjoncteur coherent avec la section du cable (1,5mm2 -> 16A, 2,5 -> 20A, 4 -> 25A, 6 -> 32A) (EC-PROTECTION), <= …

cao_bim_ferraillage_elements

Appelez quand vous devez VERIFIER LE FERRAILLAGE PAR ELEMENT (structure EC2) : poutres (As >= max(0,13% b.d, As flexion M/(fyd.0,9d))), voiles (As >= 0,4% section, deux faces), dalles (treillis soude …

cao_bim_vues

Appelez quand vous devez CONSTITUER LES PLANCHES DE VUES (auteur) : chaque niveau a son plan, chaque facade son elevation, avec cartouche complet (titre, echelle, date) et echelle plausible (1/20, 1/5…

cao_bim_etancheite_air

Appelez quand vous devez VERIFIER L'ETANCHEITE A L'AIR de l'enveloppe (RE2020 / NF EN 13829) : Q4Pa declare (> 0) (EA-TEST), Q4Pa <= cible (passif 0,6 / BBC 1,0 / RE2020 0,8) (EA-SEUIL), membrane d'et…

cao_bim_bouclage_ecs

Appelez quand vous devez VERIFIER LE BOUCLAGE ECS (MEP) : boucle de retour presente (BU-RETOUR), temperature de retour >= 50 deg C anti-legionelles (BU-TEMPERATURE), calorifuge d'epaisseur minimale se…

cao_bim_diffusion_air

Appelez quand vous devez VERIFIER LA DIFFUSION D'AIR (MEP) : debit par bouche dans les bornes 30-600 m3/h (DI-DEBIT), portee du jet >= distance au mur (DI-PORTEE), niveau sonore NR <= 35 dB bureaux/ha…

cao_bim_echafaudages

Appelez quand vous devez VERIFIER LES ECHAFAUDAGES DE PIED (chantier / EXE) : classe de charge 1 a 6 (NF EN 12810) (EC-CLASSE), hauteur <= 24 m sinon note de calcul declaree (EC-HAUTEUR), ancrage au b…

cao_bim_prefabrication

Appelez quand vous devez VERIFIER LES ELEMENTS PREFABRIQUES (structure) : tolerance de pose <= 10 mm (PF-TOLERANCE), calage de reglage declare (PF-CALAGE), liaison/chainage avec la structure en place …

cao_bim_levage

Appelez quand vous devez VERIFIER LES OPERATIONS DE LEVAGE (chantier / EXE) : poids <= capacite de la grue (LEV-POIDS), elingage a 4 points (LEV-ELINGAGE), angle d'elingage >= 60 deg (LEV-ANGLE), rayo…

cao_bim_eaux_usees

Appelez quand vous devez VERIFIER LE RESEAU D'EAUX USEES (MEP sanitaire, DTU 60.11) : pente des collecteurs >= 1 % (EU-PENTE), diametre chute/collecteur >= 100 mm (EU-DIAMETRE), ventilation primaire e…

cao_bim_occultation

Appelez quand vous devez VERIFIER LES PROTECTIONS SOLAIRES des baies (enveloppe / confort d'ete) : baies sud/ouest protegees (volet, store, brise-soleil) (OC-PROTECTION), occultation mobile pour le co…

cao_bim_escaliers

Appelez quand vous devez VERIFIER LES ESCALIERS (auteur / EXE) : loi de Blondel 570 <= 2h+g <= 640 mm (ES-BLONDEL), hausse de marche 150-200 mm (ES-HAUSSE), giron >= 280 mm (ES-GIRON), garde-corps >= …

cao_bim_garde_corps

Appelez quand vous devez VERIFIER LES GARDE-CORPS (NF P01-012) : hauteur >= 1000 mm (GC-HAUTEUR), remplissage sans effet d'echelle - barreaudage <= 110 mm ou plein/verre (GC-REMPLISSAGE), ancrage au s…

cao_bim_chape

Appelez quand vous devez VERIFIER LES CHAPES FLOTTANTES (second oeuvre / DTU 26.2) : epaisseur >= 50 mm (CH-EPAISSEUR), isolation sous chape R >= 2,5 m2.K/W (CH-ISOLATION), bande peripherique de desol…

cao_bim_doublage

Appelez quand vous devez VERIFIER LE DOUBLAGE ITI (enveloppe / second oeuvre) : epaisseur d'isolant >= 100 mm (DO-EPAISSEUR), resistance thermique R = e/lambda >= 2,5 m2.K/W (DO-RESISTANCE), pare-vape…

cao_bim_production_ecs

Appelez quand vous devez VERIFIER LA PRODUCTION ECS (MEP, DTU 60.11) : volume du ballon >= 50 L/occupant (PR-VOLUME), puissance du generateur >= besoin indicatif 0,4 kW/occupant (PR-PUISSANCE), appoin…

cao_bim_maconnerie

Appelez quand vous devez VERIFIER LES MURS EN MACONNERIE (gros oeuvre, NF DTU 20.1) : epaisseur >= 200 mm porteur (MA-EPAISSEUR), chainages horizontaux et verticaux (MA-CHAINAGE), hauteur <= 20 m sans…

cao_bim_cloisons

Appelez quand vous devez VERIFIER LES CLOISONS SECHES (second oeuvre, DTU 25.41) : entraxe d'ossature <= 600 mm (CL-OSSATURE), plaques de parement declarees (CL-PLAQUES), isolant acoustique des cloiso…

cao_bim_balcons

Appelez quand vous devez VERIFIER L'ETANCHEITE DES BALCONS (enveloppe, DTU 20.12) : pente >= 1 % (EB-PENTE), releve d'etancheite >= 150 mm (EB-RELEVE), evacuation des eaux pluviales declaree (EB-EVACU…

cao_bim_vmc

Appelez quand vous devez VERIFIER LA VMC (MEP, arrete ventilation) : bouches d'extraction dans les pieces humides (VMC-EXTRACTION), debits minimaux par piece (cuisine 45, SDB 30, WC 15 m3/h) (VMC-DEBI…

cao_bim_etaiement

Appelez quand vous devez VERIFIER L'ETAIEMENT DES PLANCHERS (structure / chantier, NF EN 1065) : entraxe des etais <= 1500 mm (ET-ESPACEMENT), charge par etai <= capacite (ET-CHARGE), calage/compensat…

cao_bim_ite

Appelez quand vous devez VERIFIER L'ISOLATION THERMIQUE PAR L'EXTERIEUR (ITE, enveloppe) : epaisseur >= 120 mm (ITE-EPAISSEUR), fixation mecanique declaree chevilles/rails (ITE-FIXATION), finition end…

cao_bim_couverture

Appelez quand vous devez VERIFIER LES TOITURES EN PENTE (DTU 40) : pente minimale selon materiau (tuile/ardoise 40 %, zinc/bac acier 5 %) (CO-PENTE), ecran de sous-toiture (CO-ECRAN), liteaux/volige (…

cao_bim_photovoltaique

Appelez quand vous devez VERIFIER L'INSTALLATION PHOTOVOLTAIQUE (MEP / energie) : orientation non au nord (PV-ORIENTATION), inclinaison 20-40 deg (PV-INCLINAISON), production coherente 800-1300 kWh/kW…

cao_bim_voiles

Appelez quand vous devez VERIFIER LES VOILES EN BETON (structure, EC2 / DTU 23.1) : epaisseur >= 150 mm (VO-EPAISSEUR), elancement hauteur/epaisseur <= 20 (VO-ELANCEMENT), aciers verticaux >= 0,2 % de…

cao_bim_garde_neige

Appelez quand vous devez VERIFIER LES PROTECTIONS NEIGE des toitures en pente (enveloppe, DTU 40.11) : pente declaree 0-90 (GN-PENTE), barres de retenue des 20 deg de pente (GN-BARRES), debord/paranei…

cao_bim_ventilation_naturelle

Appelez quand vous devez VERIFIER LA VENTILATION NATURELLE (MEP / enveloppe) : surface d'ouvrants >= 1/8 de la surface (VN-OUVRANTS), grilles d'entree/sortie d'air (VN-GRILLES), ventilation traversant…

cao_bim_assainissement

Appelez quand vous devez VERIFIER L'ASSAINISSEMENT NON COLLECTIF (MEP) : filiere declaree (micro_station, filtre_compact, epandage) (ANC-FILIERE), capacite >= 4 EH (ANC-EH), distances reglementaires >…

cao_bim_post_tension

Appelez quand vous devez VERIFIER LES PLANCHERS POST-TENSION (structure, precontrainte EC2) : portee <= 12 m (PC-PORTEE), cables/gaines declares (PC-CABLES), tension appliquee > 0 (PC-TENSION), ancrag…

cao_bim_plancher_chauffant

Appelez quand vous devez VERIFIER LE PLANCHER CHAUFFANT HYDRAULIQUE (MEP, DTU 65.14) : pas de pose <= 200 mm (PC-PAS), temperature de depart <= 50 deg C (PC-TEMPERATURE), longueur de boucle <= 100 m (…

cao_bim_cheminees

Appelez quand vous devez VERIFIER LES CONDUITS DE FUMEE (structure / DTU 24.1) : tubage declare (CH-TUBAGE), distance aux materiaux combustibles >= 160 mm (CH-DISTANCE), souche >= 400 mm au-dessus du …

cao_bim_finitions

Appelez quand vous devez VERIFIER LES FINITIONS INTERIEURES (second oeuvre, DTU 59.1) : support prepare (FI-SUPPORT), enduit de lissage (FI-ENDUIT), peinture >= 2 couches (FI-PEINTURE), revetement mur…

cao_bim_menuiseries_interieures

Appelez quand vous devez VERIFIER LES PORTES INTERIEURES (second oeuvre / PMR) : largeur de passage >= 830 mm (MI-LARGEUR), hauteur de passage >= 2040 mm (MI-HAUTEUR), sens d'ouverture declare (MI-OUV…

cao_bim_rafraichissement

Appelez quand vous devez VERIFIER LE RAFRAICHISSEMENT (MEP) : puissance frigorifique >= besoin (RA-PUISSANCE), fluide declare R32/R410A/eau (RA-FLUIDE), evacuation des condensats (RA-CONDENSATS), cons…

cao_bim_acroteres

Appelez quand vous devez VERIFIER LES ACROTERES de toiture-terrasse (enveloppe, DTU 20.12/43.1) : hauteur >= 150 mm (AC-HAUTEUR), couvertine (AC-COUVERTINE), isolation continue sans pont thermique (AC…

cao_bim_cesi

Appelez quand vous devez VERIFIER LE CHAUFFE-EAU SOLAIRE INDIVIDUEL (CESI, MEP / energie) : surface de capteurs >= 2 m2 (CE-SURFACE), orientation favorable pas au nord (CE-ORIENTATION), appoint d'ener…

cao_bim_double_flux

Appelez quand vous devez VERIFIER LA VMC DOUBLE FLUX (MEP, NF EN 13141) : rendement de recuperation >= 80 % (DF-RENDEMENT), reseau etanche (DF-ETANCHEITE), bypass d'ete (DF-BYPASS), filtres (DF-FILTRE…

cao_bim_enduits_facades

Appelez quand vous devez VERIFIER LES ENDUITS DE FACADE (enveloppe, DTU 26.1) : support prepare (EF-SUPPORT), epaisseur >= 15 mm (EF-EPAISSEUR), finition declaree gratte/taloche/projete (EF-FINITION),…

cao_bim_pieux

Appelez quand vous devez VERIFIER LES FONDATIONS PROFONDES (pieux, structure EC7) : diametre >= 400 mm (PI-DIAMETRE), charge <= capacite portante (PI-CHARGE), fiche d'ancrage >= 5 m (PI-FICHE), ancrag…

cao_bim_eclairage_naturel

Appelez quand vous devez VERIFIER L'ECLAIRAGE NATUREL (enveloppe / FLJ) : surface vitree >= 1/6 de la surface au sol (EN-SURFACE), profondeur <= 2 x hauteur d'allege (EN-PROFONDEUR), orientation decla…

cao_bim_eaux_grises

Appelez quand vous devez VERIFIER LA RECUPERATION D'EAUX GRISES (MEP) : echangeur de chaleur sur eaux grises (RG-ECHANGEUR), rendement >= 50 % (RG-RENDEMENT), recyclage pour WC (RG-RECYCLAGE), stockag…

cao_bim_visa_exe

Appelez quand vous devez GERER LE VISA BE DU DOSSIER D'EXECUTION (EXE contractuel) : chaque document (dossier_exe, plan, doe, note_calcul) porte un statut (a_viser | vise | refuse) et un signataire (n…

cao_bim_visa_lots

Appelez quand vous devez GERER LE VISA PAR LOT du dossier EXE (EXE multi-lots signe) : chaque lot d'execution (gros_oeuvre, charpente_couverture, menuiseries_exterieures, electricite...) porte un stat…

cao_bim_courants_faibles

Appelez quand vous devez VERIFIER LE CABLAGE COURANTS FAIBLES (VDI, MEP electricite) : >= 1 prise RJ45 par piece de vie (CF-RJ45), baie de brassage (CF-BAIE), separation courants forts/faibles (CF-SEP…

cao_bim_eclairage_securite

Appelez quand vous devez VERIFIER L'ECLAIRAGE DE SECURITE (BAES, reglement securite) : blocs autonomes declares (ES-BAES), eclairage d'evacuation (ES-EVACUATION), autonomie >= 1 h (ES-AUTONOMIE), test…

cao_bim_joints_dilatation

Appelez quand vous devez VERIFIER LES JOINTS DE DILATATION (structure) : espacement <= 30 m (JD-ESPACEMENT), largeur >= 15 mm (JD-LARGEUR), materiau de remplissage (JD-REMPLISSAGE), continuite a trave…

cao_bim_cuvelage

Appelez quand vous devez VERIFIER LE CUVELAGE DES SOUS-SOLS (DTU 14.1) : membrane d'etancheite (CU-ETANCHEITE), drain peripherique (CU-DRAINAGE), pompe de relevage (CU-RELEVAGE), protection de la memb…

cao_bim_sous_station

Appelez quand vous devez VERIFIER LA SOUS-STATION DU RESEAU DE CHALEUR URBAIN (MEP) : echangeur primaire/secondaire (SS-ECHANGEUR), puissance souscrite >= besoin (SS-PUISSANCE), compteur d'energie (SS…

cao_bim_groupes_electrogene

Appelez quand vous devez VERIFIER LE GROUPE ELECTROGENE DE SECOURS (MEP electricite) : puissance >= besoins secourus (GE-PUISSANCE), commutation automatique / inverseur de source (GE-COMMUTATION), aut…

cao_bim_onduleur

Appelez quand vous devez VERIFIER L'ONDULEUR / ASI (MEP electricite) : puissance >= charge (ON-PUISSANCE), autonomie batteries >= 15 min (ON-AUTONOMIE), bypass de maintenance (ON-BYPASS), supervision …

cao_bim_chaufferie

Appelez quand vous devez VERIFIER LA CHAUFFERIE COLLECTIVE (MEP) : chaudieres declarees >= 1 (CH-EQUIPEMENT), separation circuits primaire/secondaire (CH-CIRCUITS), bouteille casse-pression (CH-CASSE-…

cao_bim_gtb

Appelez quand vous devez VERIFIER LA GTB - GESTION TECHNIQUE DU BATIMENT (MEP / domotique) : centrale de supervision (GT-SUPERVISION), capteurs CO2 + presence (GT-CAPTEURS), regulation par zone (GT-ZO…

cao_bim_ventilation_garage

Appelez quand vous devez VERIFIER LA VENTILATION DE PARKING (MEP, CO 43 / NF EN 12101) : debit >= 6 vol/h (VG-DEBIT), detection de CO (VG-CO), extraction mecanique (VG-EXTRACTION), gaines coupe-feu (V…

cao_bim_vitrages_performance

Appelez quand vous devez VERIFIER LES PERFORMANCES DES VITRAGES (enveloppe) : facteur solaire Sg <= 0,4 sur sud/ouest (VP-SOLAIRE), transmission lumineuse TL >= 0,5 (VP-LUMIERE), Uw <= 1,1 triple / 1,…

cao_bim_comptage

Appelez quand vous devez VERIFIER LE COMPTAGE DIVISIONNAIRE DES FLUIDES (MEP) : compteurs par usage eau/gaz/electricite (CO-DIVISIONNAIRES), tele-releve (CO-TELERELEVE), releve d'index (CO-INDEX), acc…

cao_bim_gaines_techniques

Appelez quand vous devez VERIFIER LES GAINES TECHNIQUES VERTICALES (MEP) : reservation dans la dalle/plancher (GT-RESERVATION), cloisonnement coupe-feu (GT-COUPE-FEU), trappe de visite (GT-ACCES), ven…

cao_bim_vide_sanitaire

Appelez quand vous devez VERIFIER LE VIDE SANITAIRE (structure, DTU 20.1) : hauteur >= 20 cm (VS-HAUTEUR), grilles de ventilation (VS-VENTILATION), trappe d'acces (VS-ACCES), drainage du sol (VS-DRAIN…

cao_bim_cet

Appelez quand vous devez VERIFIER LE CHAUFFE-EAU THERMODYNAMIQUE (CET, MEP / energie) : COP >= 3,0 (CE-COP), prise d'air gaine ou air ambiant (CE-GAINE), appoint electrique (CE-APPOINT), emplacement l…

cao_bim_jonctions_etancheite

Appelez quand vous devez VERIFIER L'ETANCHEITE A L'AIR PAR JONCTION (enveloppe) : type de jonction connu mur_dalle/menuiserie/gaine/traversee (JA-TYPE), jonction traitee (JA-TRAITEMENT), materiau memb…

cao_bim_pare_pluie

Appelez quand vous devez VERIFIER L'ECRAN PARE-PLUIE / FACADE VENTILEE (enveloppe, DTU 41.2) : ecran pare-pluie (PP-ECRAN), lame d'air ventilee (PP-LAME), bardage rapporte (PP-BARDAGE), points singuli…

cao_bim_detection_incendie

Appelez quand vous devez VERIFIER LA DETECTION INCENDIE (SSI, MEP / securite) : detecteurs de fumee >= 1 (DI-DETECTEURS), centrale SSI (DI-CENTRALE), asservissements desenfumage/portes CF (DI-ASSERVIS…

cao_bim_toiture_vegetalisee

Appelez quand vous devez VERIFIER LA TOITURE VEGETALISEE (enveloppe, DTU 43.1) : membrane anti-racine (TV-ANTI-RACINE), couche drainante (TV-DRAINAGE), substrat >= 8 cm (TV-SUBSTRAT), surcharge verifi…

cao_bim_geothermie

Appelez quand vous devez VERIFIER LA GEOTHERMIE (MEP) : sondes geothermiques >= 1 (GE-SONDES), profondeur >= 50 m (GE-PROFONDEUR), puissance PAC >= besoin (GE-PUISSANCE), autorisation de forage (GE-AU…

cao_bim_dalle_terre_plein

Appelez quand vous devez VERIFIER LA DALLE SUR TERRE-PLEIN (structure, DTU 13.3) : herisson drainant (DT-HERISSON), film polyane anti-remontee (DT-POLYANE), isolation sous dalle (DT-ISOLATION), epaiss…

cao_bim_raccordement_egout

Appelez quand vous devez VERIFIER LE RACCORDEMENT A L'EGOUT (MEP / VRD) : pente >= 2 % (RA-PENTE), regard de branchement (RA-REGARD), autorisation de raccordement (RA-AUTORISATION), exutoire reseau pu…

cao_bim_murs_rideaux

Appelez quand vous devez VERIFIER LES MURS-RIDEAUX / FACADES RIDEAU (enveloppe, DTU 33.1) : ossature montants/traverses (MR-OSSATURE), vitrage double (MR-VITRAGE), joints d'etancheite (MR-JOINTS), jeu…

cao_bim_facade_double_peau

Appelez quand vous devez VERIFIER LA FACADE DOUBLE PEAU (enveloppe) : lame d'air (DP-LAME), protection solaire integree (DP-PROTECTION), ventilation de la lame (DP-VENTILATION), acces maintenance (DP-…

cao_bim_combles

Appelez quand vous devez VERIFIER LES COMBLES (enveloppe) : isolation >= 30 cm (CO-ISOLATION), ventilation de sous-toiture (CO-VENTILATION), trappe d'acces (CO-ACCES), ecran de sous-toiture (CO-ECRAN)…

cao_bim_fenetres_toit

Appelez quand vous devez VERIFIER LES FENETRES DE TOIT (enveloppe, DTU 40.35) : kit d'etancheite (FT-ETANCHEITE), encaissement (FT-ENCAISSEMENT), inclinaison 15-85 deg (FT-INCLINAISON), acces/manoeuvr…

cao_bim_regulation_chauffage

Appelez quand vous devez VERIFIER LA REGULATION DU CHAUFFAGE (MEP) : thermostat d'ambiance (RG-THERMOSTAT), robinets thermostatiques (RG-ROBINETS), programmation horaire (RG-PROGRAMMATION), equilibrag…

cao_bim_robinetterie

Appelez quand vous devez VERIFIER LA ROBINETTERIE SANITAIRE (MEP, DTU 60.11) : robinets d'arret par appareil (RB-ARRET), clapet anti-retour (RB-ANTI-RETOUR), mitigeur thermostatique douche (RB-MITIGEU…

cao_bim_ventilation_locaux_aveugles

Appelez quand vous devez VERIFIER LA VENTILATION DES LOCAUX AVEUGLES (MEP) : extraction forcee (VA-EXTRACTION), debit >= 15 m3/h (VA-DEBIT), commande asservie a l'eclairage (VA-COMMANDE), bouche d'ext…

cao_bim_chauffage_electrique

Appelez quand vous devez VERIFIER LE CHAUFFAGE ELECTRIQUE (MEP) : radiateurs >= 1 (CHE-RADIATEURS), puissance >= besoin (CHE-PUISSANCE), regulation par piece (CHE-REGULATION), protection dediee NF C 1…

cao_bim_vrv

Appelez quand vous devez VERIFIER LE SYSTEME VRV/DRV (MEP) : unite exterieure (VR-UNITE-EXT), unites interieures >= 1 (VR-UNITES-INT), fluide R32/R410A (VR-FLUIDE), recuperation de chaleur (VR-RECUPER…

cao_bim_menuiseries_alu

Appelez quand vous devez VERIFIER LES MENUISERIES ALUMINIUM (enveloppe, DTU 36.5) : rupture de pont thermique (MA-RUPTURE), Uw <= 1,6 (MA-UW), gestion de la condensation (MA-CONDENSATION), drainage de…

cao_bim_chauffage_bois

Appelez quand vous devez VERIFIER LE CHAUFFAGE AU BOIS (MEP, DTU 24.1) : conduit de fumee (CB-CONDUIT), arrivee d'air de combustion (CB-AIR), distance aux materiaux combustibles >= 160 mm (CB-DISTANCE…

cao_bim_climatisation_gainable

Appelez quand vous devez VERIFIER LA CLIMATISATION GAINABLE (MEP) : unite gainable (CG-UNITE), reseau de gaines (CG-GAINES), reprise d'air (CG-REPRISE), regulation par zone (CG-REGULATION). scene : cl…

cao_bim_store_banne

Appelez quand vous devez VERIFIER LE STORE BANNE EXTERIEUR (enveloppe) : fixation au mur (SB-FIXATION), resistance au vent (SB-VENT), motorisation (SB-MOTORISATION), commande manuel/auto (SB-COMMANDE)…

cao_bim_chaudiere_condensation

Appelez quand vous devez VERIFIER LA CHAUDIERE GAZ A CONDENSATION (MEP, DTU 61.1) : rendement >= 98 % PCI (CC-RENDEMENT), conduit ventouse (CC-VENTOUSE), evacuation des condensats (CC-CONDENSATS), ent…

cao_bim_ventilation_hygro

Appelez quand vous devez VERIFIER LA VMC HYGROREGLABLE (MEP) : entrees d'air hygroreglables (VH-ENTREES), extraction hygroreglable (VH-EXTRACTION), regulation automatique (VH-REGULATION), debit total …

cao_bim_protection_solaire_fixe

Appelez quand vous devez VERIFIER LES PROTECTIONS SOLAIRES FIXES (auvent/brise-soleil fixe, enveloppe) : profondeur >= 300 mm (PS-PROFONDEUR), orientation sud/ouest couverte (PS-ORIENTATION), masque s…

cao_bim_menuiseries_bois

Appelez quand vous devez VERIFIER LES MENUISERIES BOIS (enveloppe, FD P20-651) : essence declaree (MB-ESSENCE), traitement insecticide/fongicide (MB-TRAITEMENT), finition lasure/peinture (MB-FINITION)…

cao_bim_parois_vitreuses

Appelez quand vous devez VERIFIER LES PAROIS/GARDE-CORPS VITRES (enveloppe, NF P01-012) : vitrage feuillete de securite (PV-VITRAGE), resistance (PV-RESISTANCE), fixation (PV-FIXATION), marquage de se…

cao_bim_cheminement_exterieur

Appelez quand vous devez VERIFIER LES CHEMINEMENTS EXTERIEURS PMR (VRD) : pente <= 5 % (CH-PENTE), revetement antiderapant (CH-REVETEMENT), largeur >= 1,20 m (CH-LARGEUR), eclairage (CH-ECLAIRAGE). sc…

cao_bim_cloture

Appelez quand vous devez VERIFIER LES CLOTURES (VRD / enveloppe) : hauteur >= 1,50 m (CL-HAUTEUR), fixation (CL-FIXATION), portail (CL-PORTAIL), acces/portillon (CL-ACCES). scene : clotures [{nom, hau…

cao_bim_douche

Appelez quand vous devez VERIFIER LA DOUCHE / receveur : receveur/etancheite (DO-RECEVEUR), robinetterie (DO-ROBINETTERIE), evacuation (DO-EVACUATION), accessibilite (DO-ACCESSIBILITE). scene : douche…

cao_bim_baignoire

Appelez quand vous devez VERIFIER LA BAIGNOIRE : robinetterie (BG-ROBINETTERIE), evacuation (BG-EVACUATION), fixation (BG-FIXATION), etancheite/releve (BG-ETANCHEITE). scene : baignoire {robinetterie,…

cao_bim_evier

Appelez quand vous devez VERIFIER L'EVIER / bac de cuisine : robinetterie (EV-ROBINETTERIE), evacuation (EV-EVACUATION), fixation (EV-FIXATION), accessibilite (EV-ACCESSIBILITE). scene : evier {robine…

cao_bim_extincteur

Appelez quand vous devez VERIFIER L'EXTINCTEUR : agent (EX-AGENT), emplacement/implantation (EX-EMPLACEMENT), signalisation (EX-SIGNALISATION), controle/maintenance (EX-CONTROLE). scene : extincteur {…

cao_bim_porte_coupe_feu

Appelez quand vous devez VERIFIER LA PORTE COUPE-FEU / bloc-porte : classement pare-flammes (PCF-CLASSEMENT), ferme-porte (PCF-FERME-PORTE), joints intumescents (PCF-JOINTS), signalisation (PCF-SIGNAL…

cao_bim_clapet_coupe_feu

Appelez quand vous devez VERIFIER LE CLAPET COUPE-FEU : commande/asservissement (CF-COMMANDE), emplacement/traversee (CF-EMPLACEMENT), acces/entretien (CF-ACCES), reperage/signalisation (CF-REPERAGE).…

cao_bim_surpresseur

Appelez quand vous devez VERIFIER LE SURPRESSEUR : alimentation/raccordement (SU-ALIMENTATION), protection/pressostat (SU-PROTECTION), drainage/evacuation (SU-DRAINAGE), acces/entretien (SU-ACCES). sc…

cao_bim_bidet

Appelez quand vous devez VERIFIER LE BIDET : robinetterie (BI-ROBINETTERIE), evacuation (BI-EVACUATION), fixation (BI-FIXATION), accessibilite (BI-ACCESSIBILITE). scene : bidet {robinetterie, evacuati…

cao_bim_caniveau

Appelez quand vous devez VERIFIER LE CANIVEAU / siphon de sol : emplacement/pente (CA-EMPLACEMENT), ecoulement/raccordement (CA-ECOULEMENT), grille/securite (CA-GRILLE), acces/entretien (CA-ENTRETIEN)…

cao_bim_ballon_ecs

Appelez quand vous devez VERIFIER LE BALLON ECS / chauffe-eau : alimentation/raccordement (BE-ALIMENTATION), groupe de securite/evacuation (BE-GROUPE-SECURITE), fixation/support (BE-FIXATION), acces/e…

cao_bim_recuperateur_eaux_grises

Appelez quand vous devez VERIFIER LE RECUPERATEUR DE CHALEUR SUR EAUX GRISES : raccordement hydraulique (RG-RACCORDEMENT), echangeur/performance (RG-ECHANGEUR), evacuation (RG-EVACUATION), acces/entre…

cao_bim_puits_canadien

Appelez quand vous devez VERIFIER LE PUITS CANADIEN / provencal : prise d'air/entree (PC-ENTREE), conduit enterre/longueur (PC-CONDUIT), pente/condensats (PC-CONDENSATS), regulation/by-pass (PC-REGULA…

cao_bim_cogeneration

Appelez quand vous devez VERIFIER LA COGENERATION : alimentation combustible/electrique (CO-ALIMENTATION), evacuation fumees (CO-FUMEES), raccordement hydraulique/electrique (CO-RACCORDEMENT), acces/e…

cao_bim_controle_acces

Appelez quand vous devez VERIFIER LE CONTROLE D'ACCES : emplacement/implantation (CA-EMPLACEMENT), alimentation/cablage (CA-ALIMENTATION), issue/deverrouillage de secours (CA-SECURITE), interface/gest…

cao_bim_issue_secours

Appelez quand vous devez VERIFIER L'ISSUE DE SECOURS / sortie : degagement/gabarit (IS-DEGAGEMENT), barre anti-panique/ouverture (IS-PANIQUE), signalisation/pictogramme (IS-SIGNALISATION), eclairage d…

cao_bim_detecteur_monoxyde

Appelez quand vous devez VERIFIER LE DETECTEUR DE MONOXYDE DE CARBONE : emplacement/hauteur (MC-EMPLACEMENT), alimentation/batterie (MC-ALIMENTATION), entretien/test (MC-ENTRETIEN), signalisation/alar…

cao_bim_detecteur_fumee

Appelez quand vous devez VERIFIER LE DETECTEUR DE FUMEE (DAFF) : emplacement/implantation (DF-EMPLACEMENT), alimentation/batterie (DF-ALIMENTATION), entretien/test (DF-ENTRETIEN), interconnexion (DF-I…

cao_bim_plateforme_pmr

Appelez quand vous devez VERIFIER LA PLATEFORME ELEVATRICE PMR : emplacement/accessibilite (PP-EMPLACEMENT), alimentation electrique (PP-ALIMENTATION), garde-corps/securite (PP-SECURITE), entretien/co…

cao_bim_porte_automatique

Appelez quand vous devez VERIFIER LA PORTE AUTOMATIQUE / coulissante : structure/rail (PA-STRUCTURE), motorisation/capteurs (PA-MOTORISATION), securite/anti-pincement (PA-SECURITE), maintenance/contro…

cao_bim_tourniquet

Appelez quand vous devez VERIFIER LE TOURNIQUET / portillon d'acces : structure/gabarit (TO-STRUCTURE), controle/badge (TO-CONTROLE), liberation/securite (TO-SECURITE), alimentation electrique (TO-ALI…

cao_bim_monte_plats

Appelez quand vous devez VERIFIER LE MONTE-PLATS : gaine/structure (MP-GAINE), motorisation/commande (MP-MOTORISATION), securite/verrouillage (MP-SECURITE), entretien/controle (MP-ENTRETIEN). scene : …

cao_bim_rideau_air

Appelez quand vous devez VERIFIER LE RIDEAU D'AIR : emplacement/implantation (RA-EMPLACEMENT), alimentation electrique (RA-ALIMENTATION), regulation/commande (RA-REGULATION), entretien/nettoyage (RA-E…

cao_bim_fosse_ascenseur

Appelez quand vous devez VERIFIER LA FOSSE D'ASCENSEUR : etancheite/cuvelage (FA-ETANCHEITE), drainage/pompe (FA-DRAINAGE), acces/echelle (FA-ACCES), securite/butoirs (FA-SECURITE). scene : fosse_asce…

cao_bim_separateur_hydrocarbures

Appelez quand vous devez VERIFIER LE SEPARATEUR D'HYDROCARBURES : emplacement/raccordement (SH-EMPLACEMENT), dimensionnement/classe (SH-DIMENSIONNEMENT), entretien/vidange (SH-ENTRETIEN), acces/contro…

cao_bim_filtration_eau

Appelez quand vous devez VERIFIER LA FILTRATION / TRAITEMENT D'EAU : emplacement/implantation (FE-EMPLACEMENT), raccordement hydraulique (FE-RACCORDEMENT), entretien/filtre (FE-ENTRETIEN), controle/qu…

cao_bim_loggia

Appelez quand vous devez VERIFIER LA LOGGIA : etancheite/revetement (LO-ETANCHEITE), garde-corps (LO-GARDE-CORPS), evacuation/pente (LO-EVACUATION), isolation/rupture pont thermique (LO-ISOLATION). sc…

cao_bim_soubassement

Appelez quand vous devez VERIFIER LE SOUBASSEMENT de facade : etancheite/arase (SO-ETANCHEITE), protection/rejet d'eau (SO-PROTECTION), isolation (SO-ISOLATION), materiau/finition (SO-MATERIAU). scene…

cao_bim_chaperon

Appelez quand vous devez VERIFIER LE CHAPERON de mur : fixation/scellement (CH-FIXATION), etancheite/pente (CH-ETANCHEITE), debord/rejet d'eau (CH-DEBORD), materiau/protection (CH-MATERIAU). scene : c…

cao_bim_pannes

Appelez quand vous devez VERIFIER LES PANNES de charpente : section/materiau (PA-SECTION), fixation/liaison (PA-FIXATION), portee/appuis (PA-APPUIS), protection/traitement (PA-PROTECTION). scene : pan…

cao_bim_chevrons

Appelez quand vous devez VERIFIER LES CHEVRONS de charpente : section/materiau (CH-SECTION), fixation/liaison (CH-FIXATION), appuis/entraxe (CH-APPUIS), protection/traitement (CH-PROTECTION). scene : …

cao_bim_sabliere

Appelez quand vous devez VERIFIER LA SABLIERE : section/materiau (SA-SECTION), fixation/ancrage (SA-FIXATION), appuis/repartition (SA-APPUIS), protection/traitement (SA-PROTECTION). scene : sabliere {…

cao_bim_entrait

Appelez quand vous devez VERIFIER L'ENTRAIT de ferme : section/materiau (EN-SECTION), assemblage/connecteurs (EN-ASSEMBLAGE), appuis/portee (EN-APPUIS), protection/traitement (EN-PROTECTION). scene : …

cao_bim_poincon

Appelez quand vous devez VERIFIER LE POINCON de ferme : section/materiau (PO-SECTION), assemblage/connecteurs (PO-ASSEMBLAGE), alignement/aplomb (PO-ALIGNEMENT), protection/traitement (PO-PROTECTION).…

cao_bim_platines

Appelez quand vous devez VERIFIER LES PLATINES d'assemblage : section/epaisseur (PL-SECTION), ancrage/boulons (PL-ANCRAGE), soudure/assemblage (PL-SOUDURE), protection/anti-corrosion (PL-PROTECTION). …

cao_bim_jarrets

Appelez quand vous devez VERIFIER LES JARRETS : section/dimension (JA-SECTION), fixation/soudure (JA-FIXATION), position/angle (JA-POSITION), protection/anti-corrosion (JA-PROTECTION). scene : jarrets…

cao_bim_blochets

Appelez quand vous devez VERIFIER LES BLOCHETS : section/materiau (BL-SECTION), fixation/liaison (BL-FIXATION), appuis/portee (BL-APPUIS), protection/traitement (BL-PROTECTION). scene : blochets {sect…

cao_bim_noeuds_charpente

Appelez quand vous devez VERIFIER LES NOEUDS DE CHARPENTE bois : assemblage/type (NC-ASSEMBLAGE), embrevement/tenon-mortaise (NC-EMBREVEMENT), broches/boulons (NC-BROCHAGE), protection/traitement (NC-…

cao_bim_plan_fabrication

Appelez quand vous devez VERIFIER LE PLAN DE FABRICATION / shop drawing : cotes (FD-COTES), reperes elements/assemblages (FD-REPERES), percages/soudures (FD-PERCAGES), tableau de tolerances (FD-TOLERA…

cao_bim_assemblage_poteau_poutre

Appelez quand vous devez VERIFIER L'ASSEMBLAGE POTEAU-POUTRE acier : platine d'about/eclisse (AP-PLATINE-ABOUT), boulons/rangees (AP-BOULONS), jarret/gousset/raidisseur (AP-JARRET), protection/anti-co…

cao_bim_soudures

Appelez quand vous devez VERIFIER LES SOUDURES d'assemblage : procede/type de cordon (SO-TYPE), gorge/epaisseur (SO-DIMENSION), controle/ressuage/radiographie (SO-CONTROLE), qualification soudeur/QMOS…

cao_bim_etriers

Appelez quand vous devez VERIFIER LES ETRIERS / suspentes de solivage : type/modele (ET-TYPE), fixation/pointes/vis (ET-FIXATION), capacite/charge admissible (ET-CAPACITE), protection/galvanisation (E…

cao_bim_geometrie_libre

Appelez quand vous devez VERIFIER UNE GEOMETRIE LIBRE declaree en donnees (points de controle, continuite, fermeture, resolution) : controle/points_controle (GF-CONTROLE), continuite/tangence C1/C2 (G…

cao_bim_intervenants

Appelez quand vous devez VERIFIER LES INTERVENANTS du projet : maitrise d'ouvrage (IV-MOA), maitrise d'oeuvre/BET (IV-MOE), entreprises/lots attribues (IV-ENTREPRISES), visas/responsabilites (IV-VISAS…

cao_bim_plans_recolement

Appelez quand vous devez VERIFIER LES PLANS DE RECOLEMENT (as-built) : releves/constats (PR-RELEVES), ecarts au projet (PR-ECARTS), validation/visa (PR-VALIDATION), integration au DOE (PR-INTEGRATION)…

cao_bim_levee_reserves

Appelez quand vous devez VERIFIER LA LEVEE DE RESERVES : liste des reserves (LR-LISTE), delai de levee (LR-DELAI), constat/reprise (LR-CONSTAT), validation/visa (LR-VALIDATION). scene : levee_reserves…

cao_bim_commissioning

Appelez quand vous devez VERIFIER LE COMMISSIONING / mise en service : essais/tests (CO-ESSAIS), reglages/equilibrages (CO-REGLAGES), PV/rapports (CO-PV), dossier de mise en service (CO-DOSSIER). scen…

cao_bim_test_etancheite

Appelez quand vous devez VERIFIER LE TEST D'ETANCHEITE A L'AIR (blower door) : essai/mesure (TE-TEST), seuil Q4 exige (TE-SEUIL), rapport d'essai (TE-RAPPORT), corrections/re-test (TE-CORRECTIONS). sc…

cao_bim_plan_qualite

Appelez quand vous devez VERIFIER LE PLAN QUALITE (PAQ) : plan/organisation (PQ-PLAN), controles/points d'arret (PQ-CONTROLES), enregistrements/fiches (PQ-ENREGISTREMENTS), non-conformites/actions (PQ…

cao_bim_chemin_cables

Appelez quand vous devez VERIFIER LES CHEMINS DE CABLES : cheminement/parcours (CC-CHEMINEMENT), fixation/supports (CC-FIXATION), capacite/remplissage (CC-CAPACITE), separation courants forts/faibles …

cao_bim_radier

Appelez quand vous devez VERIFIER LE RADIER (fondation superficielle generale) : epaisseur/dimension (RA-DIMENSION), armatures/ferraillage (RA-ARMATURES), etancheite/drainage (RA-ETANCHEITE), joints/r…

cao_bim_boucles_magnetiques

Appelez quand vous devez VERIFIER LES BOUCLES MAGNETIQUES (induction, malentendants) : emplacement/implantation (BM-EMPLACEMENT), alimentation/amplificateur (BM-ALIMENTATION), signalisation/pictogramm…

cao_bim_plinthes

Appelez quand vous devez VERIFIER LES PLINTHES : emplacement/longueur (PL-EMPLACEMENT), fixation/collage (PL-FIXATION), materiau/hauteur (PL-MATERIAU), finition/jonctions (PL-FINITION). scene : plinth…

cao_bim_regard_visite

Appelez quand vous devez VERIFIER LE REGARD DE VISITE (assainissement) : emplacement/raccordement (RV-EMPLACEMENT), etancheite/cunette (RV-ETANCHEITE), acces/tampon (RV-ACCES), dimension/profondeur (R…

cao_bim_vase_expansion

Appelez quand vous devez VERIFIER LE VASE D'EXPANSION : emplacement/implantation (VE-EMPLACEMENT), capacite/volume (VE-CAPACITE), raccordement hydraulique (VE-RACCORDEMENT), pression/tarage (VE-PRESSI…

cao_bim_cure_beton

Appelez quand vous devez VERIFIER LA CURE DU BETON (protection du beton jeune) : produit de cure (CU-PRODUIT), duree (CU-DUREE), conditions climatiques (CU-CONDITIONS), controle/essais (CU-CONTROLE). …

cao_bim_maturimetrie

Appelez quand vous devez VERIFIER LE SUIVI DE RESISTANCE PAR MATURITE du beton : sondes/capteurs (MA-SONDES), courbe d etalonnage (MA-COURBE), releves temperature/temps (MA-MESURES), seuils de decoffr…

cao_bim_circulateurs

Appelez quand vous devez VERIFIER DES CIRCULATEURS (pompes de circulation chauffage) : debit/hauteur manometrique (CI-DEBIT), point de fonctionnement courbe (CI-POINT), regulation/vitesse variable (CI…

cao_bim_echangeurs

Appelez quand vous devez VERIFIER DES ECHANGEURS (a plaques / tubulaires) : puissance echangee (EC-PUISSANCE), circuits primaire/secondaire (EC-CIRCUITS), isolation calorifuge (EC-ISOLATION), entretie…

cao_bim_joints_dilatation_ba

Appelez quand vous devez VERIFIER DES JOINTS DE DILATATION EN BETON ARME (joint de dalle) : armatures de liaison/attentes (JB-ARMATURES), largeur >= 15 mm (JB-LARGEUR), profile/couvre-joint (JB-PROFIL…

cao_bim_poutres_precontraintes

Appelez quand vous devez VERIFIER DES POUTRES EN BETON PRECONTRAINT (pre-tension) : section b/h (PP-SECTION), cables/fils precontraints (PP-CABLES), tension de precontrainte (PP-TENSION), transfert/an…

cao_bim_calepinage_reprises

Appelez quand vous devez VERIFIER LE CALEPINAGE DES REPRISES DE BETONNAGE (plan des arrets de coulage) : plan/phasage (CR-PLAN), positions des arrets (CR-POSITIONS), produits de reprise (CR-PRODUITS),…

cao_bim_protection_incendie_structure

Appelez quand vous devez VERIFIER LA PROTECTION INCENDIE DES STRUCTURES : systeme flocage/intumescent/plaque (PF-SYSTEME), epaisseur/masse (PF-EPASSEUR), stabilite au feu requise R30/R60/R120 (PF-STAB…

cao_bim_dalles_alveolees

Appelez quand vous devez VERIFIER DES DALLES ALVEOLEES (planchers precontraints) : type/section epaisseur alveoles (DA-TYPE), portee (DA-PORTEE), armature/fils adherents precontraints (DA-ARMATURE), a…

cao_bim_fiches_techniques

Appelez quand vous devez VERIFIER DES FICHES TECHNIQUES PRODUIT : caracteristiques techniques (FT-CARACTERISTIQUES), domaine d emploi (FT-DOMAINE), mise en oeuvre (FT-MISE_EN_OEUVRE), performances (FT…

cao_bim_tirants_precontraints

Appelez quand vous devez VERIFIER DES TIRANTS D ANCRAGE PRECONTRAINTS : barre/cable type diametre (TP-BARRE), tension/force de precontrainte (TP-TENSION), ancrage scellement/tete (TP-ANCRAGE), control…

cao_bim_releves_etancheite

Appelez quand vous devez VERIFIER DES RELEVES D ETANCHEITE (pied de paroi) : hauteur de releve >= 150 mm (RE-HAUTEUR), support/primaire (RE-SUPPORT), protection releve/solin (RE-PROTECTION), joint/jon…

cao_bim_amortisseurs

Appelez quand vous devez VERIFIER DES AMORTISSEURS DE DISSIPATION D ENERGIE (sismique/vent) : type visqueux/friction/metallique (AM-TYPE), force/course (AM-CAPACITE), fixation aux structures (AM-FIXAT…

cao_bim_parois_clouees

Appelez quand vous devez VERIFIER DES PAROIS CLOUEES (clouage de sols) : clous densite/longueur/inclinaison (PC-CLOUS), parement beton projete/treillis (PC-PAREMENT), drainage (PC-DRAINAGE), stabilite…

cao_bim_micropieux

Appelez quand vous devez VERIFIER DES MICROPIEUX (fondations profondes de petit diametre) : diametre/longueur (MI-DIMENSIONS), fichage/scellement dans le terrain (MI-FICHAGE), tube/armature + coulis (…

cao_bim_isolateurs_sismiques

Appelez quand vous devez VERIFIER DES ISOLATEURS SISMIQUES (base isolee) : type elastomere/glissement/pendule (IS-TYPE), capacite verticale + deplacement lateral (IS-CAPACITE), pose/ancrage haut-bas (…

cao_bim_reprise_en_sous_oeuvre

Appelez quand vous devez VERIFIER UNE REPRISE EN SOUS-OEUVRE : etaiement/contreventement (RS-ETAIEMENT), plots successifs/phasage (RS-PLOTS), transfert de charges/verinage (RS-TRANSFERT), surveillance…

cao_bim_treillis_soudes

Appelez quand vous devez VERIFIER DES TREILLIS SOUDES (panneaux BA) : type/panneau ST25/ST40/ST60 (TS-TYPE), maille/diametre (TS-MAILLE), recouvrement/chainage (TS-RECOUVREMENT), position/calage/enrob…

cao_bim_consoles_courtes

Appelez quand vous devez VERIFIER DES CONSOLES COURTES / CORBEAUX (beton arme) : geometrie (CS-GEOMETRIE), armatures tirant/cadres (CS-ARMATURES), appui/encastrement (CS-APPUI), classe de beton (CS-BE…

cao_bim_appareils_appui

Appelez quand vous devez VERIFIER DES APPAREILS D APPUI (elastomere frette / neoprene / pot) : type (AA-TYPE), dimensions/capacite (AA-DIMENSIONS), pose/calage (AA-POSE), protection/durabilite (AA-PRO…

cao_bim_composants_adaptatifs

Appelez quand vous devez VERIFIER DES COMPOSANTS ADAPTATIFS (points d adaptation qui regenerent la forme) : points d adaptation (AC-POINTS), placement/hote (AC-HOTE), parametres lies (AC-PARAMETRES), …

cao_bim_banches_coffrages

Appelez quand vous devez VERIFIER LE PLAN DE BANCHAGE / COFFRAGE : modules de banche (BA-MODULES), plan de coffrage/hauteur (BA-PLAN), etaiement/contreventement (BA-STABILITE), rotation/reemploi (BA-R…

cao_bim_edition_visuelle

Appelez quand vous devez VERIFIER UNE EDITION VISUELLE (push-pull / poignees) declaree en donnees : element et face/sommet cibles (EV-CIBLE), operation (EV-OPERATION), valeur/delta (EV-VALEUR), revali…

cao_bim_nurbs

Appelez quand vous devez EVALUER ET VERIFIER DES NURBS / SPLINES (courbes et surfaces organiques) : points de controle (NU-POINTS), degre (NU-DEGRE), vecteur de noeuds (NU-NOEUDS), poids rationnels (N…

cao_bim_operations_booleennes

Appelez quand vous devez VERIFIER DES OPERATIONS BOOLEENNES (union / intersection / difference entre solides, cut/join) declarees en donnees : operandes (BO-OPERANDES), operateur (BO-OPERATEUR), resul…

cao_bim_implantation

Appelez quand vous devez VERIFIER L IMPLANTATION du batiment : referencement/rattachement cadastral (IM-REFERENCEMENT), axes/points de construction (IM-AXES), altimetrie NGF (IM-ALTIMETRIE), tolerance…

cao_bim_connecteurs

Appelez quand vous devez VERIFIER LES CONNECTEURS (goujons beton-acier, plancher collaborant) : position/espacement (CO-POSITION), type/diametre/hauteur (CO-TYPE), nombre/densite (CO-NOMBRE), soudure/…

cao_bim_declaration_performances

Appelez quand vous devez VERIFIER LA DECLARATION DE PERFORMANCES (DoP / marquage CE) : produit/type/reference (DP-PRODUIT), norme harmonisee EN ou evaluation technique (DP-NORME), performances/classes…

cao_bim_reprises_betonnage

Appelez quand vous devez VERIFIER LES REPRISES DE BETONNAGE (arrets/reprises de coulage BA) : position/arret de coulage (RB-POSITION), produit de reprise (RB-PRODUIT), continuite/attentes d armatures …

cao_bim_purgeurs

Appelez quand vous devez VERIFIER LES PURGEURS (vapeur / air) : emplacement/implantation (TP-EMPLACEMENT), raccordement hydraulique (TP-RACCORDEMENT), entretien/controle (TP-ENTRETIEN), evacuation/pur…

cao_bim_separateur_air

Appelez quand vous devez VERIFIER LE SEPARATEUR D'AIR / purgeur automatique : emplacement/implantation (SA-EMPLACEMENT), raccordement hydraulique (SA-RACCORDEMENT), entretien/purge (SA-ENTRETIEN), con…

cao_bim_filtre_boue

Appelez quand vous devez VERIFIER LE FILTRE A BOUE / desemboueur : emplacement/implantation (FB-EMPLACEMENT), raccordement hydraulique (FB-RACCORDEMENT), entretien/purge (FB-ENTRETIEN), controle/netto…

cao_bim_vannes_isolement

Appelez quand vous devez VERIFIER LES VANNES D'ISOLEMENT : emplacement/reseau (VI-EMPLACEMENT), accessibilite (VI-ACCESSIBILITE), manoeuvre/sens de fermeture (VI-MANOEUVRE), signalisation/etiquetage (…

cao_bim_grilles_ventilation

Appelez quand vous devez VERIFIER LES GRILLES / BOUCHES DE VENTILATION : emplacement/implantation (GV-EMPLACEMENT), debit/section (GV-DEBIT), entretien/nettoyage (GV-ENTRETIEN), conformite/norme (GV-C…

cao_bim_anti_pigeons

Appelez quand vous devez VERIFIER LES DISPOSITIFS ANTI-PIGEONS : emplacement/zones (AP-EMPLACEMENT), dispositif/type (AP-DISPOSITIF), entretien/nettoyage (AP-ENTRETIEN), securite/acces (AP-SECURITE). …

cao_bim_bandes_podotactiles

Appelez quand vous devez VERIFIER LES BANDES PODOTACTILES (bandes d'eveil de vigilance) : emplacement/implantation (BP-EMPLACEMENT), contraste visuel/tactile (BP-CONTRASTE), continuite/largeur (BP-CON…

cao_bim_capteurs_ambiance

Appelez quand vous devez VERIFIER LES CAPTEURS D'AMBIANCE (CO2, temperature, humidite) : emplacement/hauteur (CS-EMPLACEMENT), alimentation/bus (CS-ALIMENTATION), regulation/GTB (CS-REGULATION), etalo…

cao_bim_ppsps

Appelez quand vous devez VERIFIER LE PPSPS (plan de prevention sante-securite) : analyse des risques (PS-ANALYSE), mesures de prevention (PS-MESURES), intervenants/coordination (PS-INTERVENANTS), affi…

cao_bim_thermographie

Appelez quand vous devez VERIFIER LA THERMOGRAPHIE : campagne/conditions (TH-CAMPAGNE), ponts thermiques releves (TH-PONTS), rapport/cliches (TH-RAPPORT), corrections/reprise (TH-CORRECTIONS). scene :…

cao_bim_gestion_dechets

Appelez quand vous devez VERIFIER LE PLAN DE GESTION DES DECHETS de chantier : tri/bennes (GD-TRI), bordereaux de suivi (GD-BORDEREAUX), filieres/exutoires (GD-FILIERES), suivi/valorisation (GD-SUIVI)…

cao_bim_exploitation

Appelez quand vous devez VERIFIER LE DOSSIER D'EXPLOITATION : dossier (EX-DOSSIER), consignes d'usage (EX-CONSIGNES), interlocuteurs/contrats (EX-INTERLOCUTEURS), suivi/indicateurs (EX-SUIVI). scene :…

cao_bim_carnet_entretien

Appelez quand vous devez VERIFIER LE CARNET D'ENTRETIEN : equipements inventories (CE-EQUIPEMENTS), periodicite/echeances (CE-PERIODICITE), prestataire/contrat (CE-PRESTATAIRE), historique/interventio…

cao_bim_indices_revision

Appelez quand vous devez VERIFIER L'INDICE DE REVISION d'un document : indice/lettre (IR-INDICE), date (IR-DATE), objet/motif (IR-OBJET), validation/visa (IR-VALIDATION). scene : indices_revision {ind…

cao_bim_edition_parametrique

Appelez quand vous devez VERIFIER UNE EDITION PARAMETRIQUE declaree en donnees (equivalent scriptable de l'edition) : cible/repere (EP-CIBLE), operation deplacer/rotation/echelle (EP-OPERATION), param…

cao_bim_armatures_attente

Appelez quand vous devez VERIFIER LES ARMATURES D'ATTENTE : position/implantation (AA-POSITION), longueur d'ancrage/recouvrement (AA-ANCRAGE), diametre/espacement (AA-DIAMETRE), protection/enrobage (A…

cao_bim_boulons_hr

Appelez quand vous devez VERIFIER LES BOULONS A HAUTE RESISTANCE : classe 8.8/10.9 (BH-CLASSE), serrage/couple/precontrainte (BH-SERRAGE), controle de serrage (BH-CONTROLE), protection/traitement (BH-…

cao_bim_scellement_ancrage

Appelez quand vous devez VERIFIER LE SCELLEMENT / ANCRAGE : tiges/chevilles (SA-TIGES), profondeur d'ancrage (SA-PROFONDEUR), resine/mortier (SA-PRODUIT), controle/essai d'arrachement (SA-CONTROLE). s…

cao_bim_famille_imbriquee

Appelez quand vous devez VERIFIER UNE FAMILLE IMBRIQUEE / nested : familles enfants (FI-ENFANTS), parametres herites/lies (FI-PARAMETRES), contraintes propagees (FI-CONTRAINTES), instances/occurrences…

cao_bim_pied_poteau

Appelez quand vous devez VERIFIER LE PIED DE POTEAU acier : platine/dimension (PP-PLATINE), tiges d'ancrage/boulons (PP-ANCRAGE), scellement/calage (PP-SCELLEMENT), protection/anti-corrosion (PP-PROTE…

cao_bim_chevetres

Appelez quand vous devez VERIFIER LES CHEVETRES : section/materiau (CH-SECTION), fixation/liaison (CH-FIXATION), appuis/portee (CH-APPUIS), protection/traitement (CH-PROTECTION). scene : chevetres {se…

cao_bim_nervures

Appelez quand vous devez VERIFIER LES NERVURES beton : section/geometrie (NE-SECTION), armatures/ferraillage (NE-ARMATURES), appuis/portee (NE-APPUIS), coffrage/betonnage (NE-COFFRAGE). scene : nervur…

cao_bim_goussets

Appelez quand vous devez VERIFIER LES GOUSSETS d'assemblage : section/epaisseur (GO-SECTION), fixation/boulons (GO-FIXATION), position/alignement (GO-POSITION), protection/anti-corrosion (GO-PROTECTIO…

cao_bim_raidisseurs

Appelez quand vous devez VERIFIER LES RAIDISSEURS : section/epaisseur (RA-SECTION), fixation/soudure (RA-FIXATION), position/espacement (RA-POSITION), protection/anti-corrosion (RA-PROTECTION). scene …

cao_bim_potelets

Appelez quand vous devez VERIFIER LES POTELETS / montants : section/materiau (PO-SECTION), fixation/liaison (PO-FIXATION), entraxe/position (PO-ENTRAXE), protection/traitement (PO-PROTECTION). scene :…

cao_bim_contrefiches

Appelez quand vous devez VERIFIER LES CONTREFICHES : section/materiau (CF-SECTION), fixation/assemblage (CF-FIXATION), position/inclinaison (CF-POSITION), protection/traitement (CF-PROTECTION). scene …

cao_bim_fermes

Appelez quand vous devez VERIFIER LES FERMES de charpente : composition/section (FE-COMPOSITION), assemblage/connecteurs (FE-ASSEMBLAGE), appuis/portee (FE-APPUIS), protection/traitement (FE-PROTECTIO…

cao_bim_tirants

Appelez quand vous devez VERIFIER LES TIRANTS : section/materiau (TI-SECTION), ancrage/platine (TI-ANCRAGE), mise en tension (TI-TENSION), protection/anti-corrosion (TI-PROTECTION). scene : tirants {s…

cao_bim_tableau_baie

Appelez quand vous devez VERIFIER LE TABLEAU DE BAIE : fixation/support (TB-FIXATION), etancheite/calfeutrement (TB-ETANCHEITE), isolation/rupture pont thermique (TB-ISOLATION), finition/habillage (TB…

cao_bim_allege

Appelez quand vous devez VERIFIER L'ALLEGE de baie : isolation/rupture pont thermique (AL-ISOLATION), etancheite/rejet d'eau (AL-ETANCHEITE), fixation/support (AL-FIXATION), parement/finition (AL-FINI…

cao_bim_corniche

Appelez quand vous devez VERIFIER LA CORNICHE : fixation/ancrage (CO-FIXATION), etancheite/rejet d'eau (CO-ETANCHEITE), debord/protection (CO-PROTECTION), materiau/finition (CO-MATERIAU). scene : corn…

cao_bim_bac_decantation

Appelez quand vous devez VERIFIER LE BAC DE DECANTATION : emplacement/raccordement (BD-EMPLACEMENT), dimensionnement/volume (BD-DIMENSIONNEMENT), entretien/curage (BD-ENTRETIEN), acces/controle (BD-AC…

cao_bim_ecran_thermique

Appelez quand vous devez VERIFIER L'ECRAN THERMIQUE : structure/rail (ET-STRUCTURE), isolation/performance (ET-ISOLATION), motorisation/commande (ET-MOTORISATION), entretien/controle (ET-ENTRETIEN). s…

cao_bim_reserve_incendie

Appelez quand vous devez VERIFIER LA RESERVE / BACHE INCENDIE : capacite/volume (RI-CAPACITE), acces/pompe (RI-ACCES), signalisation/reperage (RI-SIGNALISATION), entretien/controle (RI-ENTRETIEN). sce…

cao_bim_palan

Appelez quand vous devez VERIFIER LE PALAN / appareil de levage : support/structure (PA-SUPPORT), motorisation/commande (PA-MOTORISATION), securite/charge (PA-SECURITE), entretien/controle (PA-ENTRETI…

cao_bim_porte_revolving

Appelez quand vous devez VERIFIER LA PORTE A TAMBOUR / revolving : structure/vantaux (PR-STRUCTURE), motorisation/commande (PR-MOTORISATION), securite/anti-pincement (PR-SECURITE), maintenance/control…

cao_bim_vide_ordures

Appelez quand vous devez VERIFIER LE VIDE-ORDURES / colonne de dechets : conduit/colonne (VO-CONDUIT), local/reception (VO-RECEPTION), ventilation (VO-VENTILATION), securite/incendie (VO-SECURITE). sc…

cao_bim_escalator

Appelez quand vous devez VERIFIER L'ESCALATOR / tapis roulant : structure/marches (ES-STRUCTURE), motorisation/commande (ES-MOTORISATION), securite/arret d'urgence (ES-SECURITE), entretien/controle (E…

cao_bim_monte_escalier

Appelez quand vous devez VERIFIER LE MONTE-ESCALIER : rail/structure (ME-RAIL), alimentation electrique (ME-ALIMENTATION), securite/ceinture (ME-SECURITE), entretien/controle (ME-ENTRETIEN). scene : m…

cao_bim_rideau_metal

Appelez quand vous devez VERIFIER LE RIDEAU METALLIQUE / grille : structure/rails (RM-STRUCTURE), motorisation/commande (RM-MOTORISATION), securite/fin de course (RM-SECURITE), maintenance/controle (R…

cao_bim_douche_securite

Appelez quand vous devez VERIFIER LA DOUCHE DE SECURITE / rince-oeil : emplacement/accessibilite (DS-EMPLACEMENT), alimentation en eau (DS-ALIMENTATION), signalisation/pictogramme (DS-SIGNALISATION), …

cao_bim_defibrillateur

Appelez quand vous devez VERIFIER LE DEFIBRILLATEUR (DAE) : emplacement/accessibilite (DF-EMPLACEMENT), signalisation/pictogramme (DF-SIGNALISATION), alimentation/batterie (DF-ALIMENTATION), maintenan…

cao_bim_video_surveillance

Appelez quand vous devez VERIFIER LA VIDEOSURVEILLANCE : emplacement/couverture (VS-COUVERTURE), alimentation/cablage (VS-ALIMENTATION), enregistrement/stockage (VS-ENREGISTREMENT), conformite/informa…

cao_bim_transformateur

Appelez quand vous devez VERIFIER LE TRANSFORMATEUR / poste electrique : emplacement/implantation (TR-EMPLACEMENT), protection/coupure (TR-PROTECTION), refroidissement/ventilation (TR-REFROIDISSEMENT)…

cao_bim_pompe_a_chaleur

Appelez quand vous devez VERIFIER LA POMPE A CHALEUR (PAC) : raccordement hydraulique (PAC-RACCORDEMENT), unite exterieure/interieure (PAC-UNITE), evacuation condensats (PAC-CONDENSATS), regulation (P…

cao_bim_deshumidificateur

Appelez quand vous devez VERIFIER LE DESHUMIDIFICATEUR : raccordement/evacuation (DH-RACCORDEMENT), regulation/hygrometrie (DH-REGULATION), fixation/support (DH-FIXATION), acces/entretien (DH-ACCES). …

cao_bim_ballon_tampon

Appelez quand vous devez VERIFIER LE BALLON TAMPON : raccordement hydraulique (BT-RACCORDEMENT), isolation thermique (BT-ISOLATION), purge/vidange (BT-VIDANGE), acces/entretien (BT-ACCES). scene : bal…

cao_bim_microstation

Appelez quand vous devez VERIFIER LA MICROSTATION / assainissement autonome : emplacement/implantation (MI-EMPLACEMENT), capacite/traitement (MI-TRAITEMENT), rejet/evacuation (MI-REJET), entretien/vid…

cao_bim_sanibroyeur

Appelez quand vous devez VERIFIER LE SANIBROYEUR / WC broyeur : alimentation eau (SB-ALIMENTATION), refoulement/evacuation (SB-REFOULEMENT), alimentation electrique (SB-ELECTRICITE), acces/entretien (…

cao_bim_pompe_relevage

Appelez quand vous devez VERIFIER LA POMPE DE RELEVAGE : alimentation/raccordement (PR-ALIMENTATION), clapet anti-retour (PR-CLAPET), alarme/seuil (PR-ALARME), acces/entretien (PR-ACCES). scene : pomp…

cao_bim_bac_a_graisse

Appelez quand vous devez VERIFIER LE BAC A GRAISSE : emplacement/raccordement (BG-EMPLACEMENT), volume/dimensionnement (BG-DIMENSIONNEMENT), acces/entretien (BG-ENTRETIEN), ventilation/event (BG-VENTI…

cao_bim_adoucisseur

Appelez quand vous devez VERIFIER L'ADOUCISSEUR D'EAU : alimentation/raccordement (AD-ALIMENTATION), evacuation/egout (AD-EVACUATION), by-pass (AD-BY-PASS), acces/entretien (AD-ACCES). scene : adoucis…

cao_bim_urinoir

Appelez quand vous devez VERIFIER L'URINOIR : chasse/robinetterie (UR-CHASSE), evacuation (UR-EVACUATION), fixation (UR-FIXATION), accessibilite (UR-ACCESSIBILITE). scene : urinoir {chasse, evacuation…

cao_bim_robinet_exterieur

Appelez quand vous devez VERIFIER LE ROBINET EXTERIEUR : antigel (RE-ANTIGEL), fixation (RE-FIXATION), purge (RE-PURGE), accessibilite (RE-ACCESSIBILITE). scene : robinet_exterieur {antigel, fixation,…

cao_bim_lavabo

Appelez quand vous devez VERIFIER LE LAVABO / vasque : robinetterie (LV-ROBINETTERIE), evacuation (LV-EVACUATION), fixation (LV-FIXATION), accessibilite (LV-ACCESSIBILITE). scene : lavabo {robinetteri…

cao_bim_wc

Appelez quand vous devez VERIFIER LE WC / toilette : evacuation (WCD-EVACUATION), robinetterie/chasse (WCD-ROBINETTERIE), fixation (WCD-FIXATION), ventilation (WCD-VENTILATION). scene : wc {evacuation…

cao_bim_colonne_seche

Appelez quand vous devez VERIFIER LA COLONNE SECHE / humide : debit/pression (CS-DEBIT), acces/raccordement (CS-ACCES), signalisation (CS-SIGNALISATION), entretien/controle (CS-ENTRETIEN). scene : col…

cao_bim_anti_refoulement

Appelez quand vous devez VERIFIER L'ANTI-REFOULEMENT / clapet anti-retour : type/clapet (ARF-TYPE), entretien (ARF-ENTRETIEN), accessibilite (ARF-ACCESSIBILITE), signalisation (ARF-SIGNALISATION). sce…

cao_bim_haie

Appelez quand vous devez VERIFIER LA HAIE / cloture vegetale : plantation (HA-PLANTATION), entretien (HA-ENTRETIEN), hauteur (HA-HAUTEUR), distance/limite (HA-DISTANCE). scene : haie {plantation, entr…

cao_bim_tableau_electrique

Appelez quand vous devez VERIFIER LE TABLEAU ELECTRIQUE / TGBT : protection/disjoncteurs (TE-PROTECTION), repartition des circuits (TE-REPARTITION), etiquetage (TE-ETIQUETAGE), accessibilite/degagemen…

cao_bim_escalier_interieur

Appelez quand vous devez VERIFIER L'ESCALIER INTERIEUR : marches/giron (EI-MARCHES), garde-corps (EI-GARDE-CORPS), eclairage (EI-ECLAIRAGE), revetement (EI-REVETEMENT). scene : escalier_interieur {mar…

cao_bim_palier

Appelez quand vous devez VERIFIER LE PALIER de circulation : degagement/largeur (PA-DEGAGEMENT), eclairage (PA-ECLAIRAGE), garde-corps (PA-GARDE-CORPS), revetement (PA-REVETEMENT). scene : palier {deg…

cao_bim_escalier_exterieur

Appelez quand vous devez VERIFIER L'ESCALIER EXTERIEUR : marches antiderapantes (ES-MARCHES), garde-corps (ES-GARDE-CORPS), drainage/evacuation EP (ES-DRAINAGE), eclairage (ES-ECLAIRAGE). scene : esca…

cao_bim_rampe_acces

Appelez quand vous devez VERIFIER LA RAMPE D'ACCES : pente (RM-PENTE), paliers de repos (RM-PALIERS), garde-corps/main courante (RM-GARDE-CORPS), revetement antiderapant (RM-REVETEMENT). scene : rampe…

cao_bim_puits_lumiere

Appelez quand vous devez VERIFIER LE PUITS DE LUMIERE / verriere zenithale : etancheite (PL-ETANCHEITE), vitrage (PL-VITRAGE), structure (PL-STRUCTURE), isolation (PL-ISOLATION). scene : puits_lumiere…

cao_bim_atrium

Appelez quand vous devez VERIFIER L'ATRIUM / hall vitre central : structure (ATR-STRUCTURE), vitrage (ATR-VITRAGE), desenfumage (ATR-DESENFUMAGE), securite/issues (ATR-SECURITE). scene : atrium {struc…

cao_bim_lucarne

Appelez quand vous devez VERIFIER LA LUCARNE / chien-assis : structure (LU-STRUCTURE), etancheite/raccord (LU-ETANCHEITE), vitrage (LU-VITRAGE), isolation (LU-ISOLATION). scene : lucarne {structure, e…

cao_bim_brise_soleil

Appelez quand vous devez VERIFIER LE BRISE-SOLEIL (protection solaire fixe) : structure (BS-STRUCTURE), fixation (BS-FIXATION), orientation/inclinaison (BS-ORIENTATION), materiau (BS-MATERIAU). scene …

cao_bim_terrasse_accessible

Appelez quand vous devez VERIFIER LA TERRASSE ACCESSIBLE : etancheite (TA-ETANCHEITE), garde-corps (TA-GARDE-CORPS), evacuation EP (TA-EVACUATION), protection/revetement (TA-PROTECTION). scene : terra…

cao_bim_verriere

Appelez quand vous devez VERIFIER LA VERRIERE / toiture vitree : structure (VR-STRUCTURE), vitrage (VR-VITRAGE), etancheite (VR-ETANCHEITE), securite/verre feuillete (VR-SECURITE). scene : verriere {s…

cao_bim_radiateur

Appelez quand vous devez VERIFIER LE RADIATEUR (chauffage) : reseau/alimentation (RA-RESEAU), robinets thermostatiques (RA-ROBINETS), fixation (RA-FIXATION), purge/desembouage (RA-PURGE). scene : radi…

cao_bim_seche_serviette

Appelez quand vous devez VERIFIER LE SECHE-SERVIETTES : reseau/alimentation (SES-RESEAU), regulation/thermostat (SES-REGULATION), fixation (SES-FIXATION), securite/terre (SES-SECURITE). scene : seche_…

cao_bim_ventilo_convecteur

Appelez quand vous devez VERIFIER LE VENTILO-CONVECTEUR : reseau/alimentation (VC-RESEAU), condensats/evacuation (VC-CONDENSATS), regulation/thermostats (VC-REGULATION), filtration (VC-FILTRATION). sc…

cao_bim_aerotherme

Appelez quand vous devez VERIFIER L'AEROTHERME : reseau/alimentation (AE-RESEAU), regulation/thermostats (AE-REGULATION), fixation (AE-FIXATION), securite/coupure (AE-SECURITE). scene : aerotherme {re…

cao_bim_plafond_rayonnant

Appelez quand vous devez VERIFIER LE PLAFOND RAYONNANT (chauffant/rafraichissant) : reseau/serpentins (PR-RESEAU), regulation/thermostats (PR-REGULATION), fixation/suspentes (PR-FIXATION), isolation (…

cao_bim_mur_rayonnant

Appelez quand vous devez VERIFIER LE MUR RAYONNANT / mur chauffant : reseau/serpentins (MU-RESEAU), regulation/thermostats (MU-REGULATION), fixation (MU-FIXATION), isolation (MU-ISOLATION). scene : mu…

cao_bim_plancher_bois

Appelez quand vous devez VERIFIER LE PLANCHER BOIS (structure) : solives/structure (PLB-SOLIVES), entretoises/stabilite (PLB-ENTRETOISES), fixation/ancrage (PLB-FIXATION), portee/section (PLB-PORTEE).…

cao_bim_ossature_bois

Appelez quand vous devez VERIFIER L'OSSATURE BOIS (MOB) : montants/structure (OB-MONTANTS), contreventement (OB-CONTREVENTEMENT), pare-pluie/etancheite (OB-PARE-PLUIE), fixation/ancrage (OB-FIXATION).…

cao_bim_mur_vegetalise

Appelez quand vous devez VERIFIER LE MUR VEGETALISE / facade verte : support/structure (MV-SUPPORT), irrigation/alimentation (MV-IRRIGATION), drainage/evacuation (MV-DRAINAGE), substrat/vegetaux (MV-S…

cao_bim_serrurerie

Appelez quand vous devez VERIFIER LA SERRURERIE / metallerie : structure metallique (MET-STRUCTURE), fixation (MET-FIXATION), protection anticorrosion (MET-PROTECTION), finition (MET-FINITION). scene …

cao_bim_abri_bus

Appelez quand vous devez VERIFIER L'ABRI BUS / abri voyageurs : structure (AB-STRUCTURE), assise/banc (AB-ASSISE), eclairage (AB-ECLAIRAGE), toiture/abri (AB-TOITURE). scene : abri_bus {structure, ass…

cao_bim_borne_incendie

Appelez quand vous devez VERIFIER LA BORNE / POTEAU INCENDIE : debit/pression (BOI-DEBIT), acces (BOI-ACCES), signalisation (BOI-SIGNALISATION), entretien/controle (BOI-ENTRETIEN). scene : borne_incen…

cao_bim_sas_parking

Appelez quand vous devez VERIFIER LE SAS D'ACCES PARKING (securite incendie) : porte coupe-feu (PK-PORTE), ventilation (PK-VENTILATION), signalisation (PK-SIGNALISATION), eclairage (PK-ECLAIRAGE). sce…

cao_bim_interphone

Appelez quand vous devez VERIFIER L'INTERPHONE / visiophone : emplacement (IP-EMPLACEMENT), alimentation (IP-ALIMENTATION), portier/controle d'acces (IP-PORTIER), cablage (IP-CABLAGE). scene : interph…

cao_bim_local_batteries

Appelez quand vous devez VERIFIER LE LOCAL BATTERIES / accumulateurs : ventilation/extraction (BAT-VENTILATION), retention/bac (BAT-RETENTION), securite/signalisation (BAT-SECURITE), acces/controle (B…

cao_bim_quai_chargement

Appelez quand vous devez VERIFIER LE QUAI DE CHARGEMENT / livraison : niveau/quai (QC-NIVEAU), securite/butoirs (QC-SECURITE), eclairage (QC-ECLAIRAGE), acces/manoeuvre (QC-ACCES). scene : quai_charge…

cao_bim_pare_vapeur

Appelez quand vous devez VERIFIER LE PARE-VAPEUR / frein-vapeur : continuite (PV-CONTINUITE), etancheite a la vapeur (PV-ETANCHEITE), pose (PV-POSE), jonctions/adhesifs (PV-JONCTIONS). scene : pare_va…

cao_bim_isolants_thermiques

Appelez quand vous devez VERIFIER L'ISOLATION THERMIQUE : resistance thermique R (IT-RESISTANCE), pose/fixation (IT-POSE), continuite de l'isolant (IT-CONTINUITE), traitement des ponts thermiques (IT-…

cao_bim_plafonds_acoustiques

Appelez quand vous devez VERIFIER LES PLAFONDS ACOUSTIQUES : absorption (PAC-ABSORPTION), suspentes/ossature (PAC-SUSPENTES), joints/etancheite (PAC-JOINTS), finition (PAC-FINITION). scene : plafonds_…

cao_bim_sols_acoustiques

Appelez quand vous devez VERIFIER LES SOLS / CHAPES ACOUSTIQUES : desolidarisation/chape flottante (SAC-DESOLIDARISATION), sous-couche (SAC-SOUS-COUCHE), absorption/affaiblissement (SAC-ABSORPTION), j…

cao_bim_murs_acoustiques

Appelez quand vous devez VERIFIER LES MURS / CLOISONS ACOUSTIQUES : affaiblissement Rw (MA-AFFAIBLISSEMENT), etancheite peripherique (MA-ETANCHEITE), fixation (MA-FIXATION), finition (MA-FINITION). sc…

cao_bim_parois_mobiles

Appelez quand vous devez VERIFIER LES PAROIS MOBILES : structure/rails (PM-STRUCTURE), acoustique (PM-ACOUSTIQUE), securite (PM-SECURITE), fixation (PM-FIXATION). scene : parois_mobiles {structure, ac…

cao_bim_salle_examen

Appelez quand vous devez VERIFIER LA SALLE D'EXAMEN (medical) : eclairage (EX-ECLAIRAGE), evier/point d'eau (EX-EVIER), ventilation (EX-VENTILATION), acces/confidentialite (EX-ACCES). scene : salle_ex…

cao_bim_pharmacie

Appelez quand vous devez VERIFIER LE LOCAL PHARMACIE / medicaments : securisation/acces (PH-SECURISATION), ventilation (PH-VENTILATION), eclairage (PH-ECLAIRAGE), rangement/stockage (PH-RANGEMENT). sc…

cao_bim_salle_blanche

Appelez quand vous devez VERIFIER LA SALLE BLANCHE / zone propre : filtration d'air (CB-FILTRATION), surpression/cascade (CB-SURPRESSION), materiaux lisses (CB-MATERIAUX), sas d'acces (CB-SAS). scene …

cao_bim_local_reprographie

Appelez quand vous devez VERIFIER LE LOCAL REPROGRAPHIE / impression : ventilation (RG-VENTILATION), alimentation electrique (RG-ALIMENTATION), eclairage (RG-ECLAIRAGE), securite/extincteur (RG-SECURI…

cao_bim_auditorium

Appelez quand vous devez VERIFIER L'AUDITORIUM / salle de spectacle : acoustique (AD-ACOUSTIQUE), eclairage (AD-ECLAIRAGE), ventilation (AD-VENTILATION), securite/issues (AD-SECURITE). scene : auditor…

cao_bim_cafeteria

Appelez quand vous devez VERIFIER LA CAFETERIA / salle de restauration : ventilation (CF-VENTILATION), eclairage (CF-ECLAIRAGE), mobilier (CF-MOBILIER), securite/issues (CF-SECURITE). scene : cafeteri…

cao_bim_salle_jeux

Appelez quand vous devez VERIFIER LA SALLE DE JEUX interieure : ventilation (JG-VENTILATION), eclairage (JG-ECLAIRAGE), securite/issues (JG-SECURITE), equipements (JG-EQUIPEMENTS). scene : salle_jeux …

cao_bim_local_depot

Appelez quand vous devez VERIFIER LE DEPOT / local de stockage : acces (DP-ACCES), rayonnage/stockage (DP-RAYONNAGE), securite incendie (DP-SECURITE), ventilation (DP-VENTILATION). scene : local_depot…

cao_bim_bureau

Appelez quand vous devez VERIFIER LE BUREAU (tertiaire) : eclairage (BO-ECLAIRAGE), ventilation (BO-VENTILATION), mobilier (BO-MOBILIER), cablage/prises (BO-CABLAGE). scene : bureau {eclairage, ventil…

cao_bim_open_space

Appelez quand vous devez VERIFIER L'OPEN SPACE (tertiaire) : eclairage (OS-ECLAIRAGE), acoustique (OS-ACOUSTIQUE), ventilation (OS-VENTILATION), cablage/prises (OS-CABLAGE). scene : open_space {eclair…

cao_bim_sejour

Appelez quand vous devez VERIFIER LE SEJOUR / SALON (logement) : surface minimale >= 12 m2 (SJ-SURFACE), eclairage naturel (SJ-ECLAIRAGE), ventilation (SJ-VENTILATION), chauffage (SJ-CHAUFFAGE). scene…

cao_bim_dressing

Appelez quand vous devez VERIFIER LE DRESSING / penderie : ventilation (DS-VENTILATION), eclairage (DS-ECLAIRAGE), rangement (DS-RANGEMENT), surface (DS-SURFACE). scene : dressing {ventilation, eclair…

cao_bim_cuisine

Appelez quand vous devez VERIFIER LA CUISINE (logement) : hotte/extraction (CU-HOTTE), circuits electriques dedies (CU-ELECTRICITE), evacuation EU (CU-EVACUATION), ventilation (CU-VENTILATION). scene …

cao_bim_chambre

Appelez quand vous devez VERIFIER LA CHAMBRE (logement) : ventilation (CH-VENTILATION), eclairage naturel (CH-ECLAIRAGE), surface minimale >= 9 m2 (CH-SURFACE), occultation (CH-OCCULTATION). scene : c…

cao_bim_salle_bain

Appelez quand vous devez VERIFIER LA SALLE DE BAIN / salle d'eau : evacuation EU/EV (SB-EVACUATION), etancheite SEL/SIPH (SB-ETANCHEITE), ventilation (SB-VENTILATION), robinetterie (SB-ROBINETTERIE). …

cao_bim_mezzanine

Appelez quand vous devez VERIFIER LA MEZZANINE : structure/plancher (ME-STRUCTURE), garde-corps (ME-GARDE-CORPS), acces escalier/echelle (ME-ACCES), charge d'exploitation (ME-CHARGE). scene : mezzanin…

cao_bim_salle_formation

Appelez quand vous devez VERIFIER LA SALLE DE FORMATION : eclairage (FR-ECLAIRAGE), mobilier (FR-MOBILIER), ventilation (FR-VENTILATION), equipements ecran/video (FR-EQUIPEMENTS). scene : salle_format…

cao_bim_showroom

Appelez quand vous devez VERIFIER LE SHOWROOM / espace d'exposition : eclairage (SW-ECLAIRAGE), ventilation (SW-VENTILATION), securite/issues (SW-SECURITE), accessibilite (SW-ACCESSIBILITE). scene : s…

cao_bim_salle_attente

Appelez quand vous devez VERIFIER LA SALLE D'ATTENTE : eclairage (WA-ECLAIRAGE), sieges (WA-SIEGES), ventilation (WA-VENTILATION), accessibilite (WA-ACCESSIBILITE). scene : salle_attente {eclairage, s…

cao_bim_sanitaires_communs

Appelez quand vous devez VERIFIER LES SANITAIRES COMMUNS / publics : sanitaires WC/lave-mains (WC-SANITAIRES), ventilation (WC-VENTILATION), accessibilite PMR (WC-ACCESSIBILITE), entretien/robinetteri…

cao_bim_laboratoire

Appelez quand vous devez VERIFIER LE LABORATOIRE : ventilation speciale (LB-VENTILATION), paillasses/equipements (LB-PAILLASSES), securite douche/lave-oeil (LB-SECURITE), evacuation/traitement (LB-EVA…

cao_bim_salle_reception

Appelez quand vous devez VERIFIER LA SALLE DE RECEPTION / accueil : eclairage (RC-ECLAIRAGE), mobilier/banque d'accueil (RC-MOBILIER), ventilation (RC-VENTILATION), accessibilite (RC-ACCESSIBILITE). s…

cao_bim_infirmerie

Appelez quand vous devez VERIFIER L'INFIRMERIE / local de premiers soins : evier/point d'eau (IN-EVIER), eclairage (IN-ECLAIRAGE), acces/accessibilite (IN-ACCES), ventilation (IN-VENTILATION). scene :…

cao_bim_salle_repos

Appelez quand vous devez VERIFIER LA SALLE DE REPOS / pause : eclairage (RP-ECLAIRAGE), ventilation (RP-VENTILATION), mobilier (RP-MOBILIER), isolation phonique (RP-ISOLATION). scene : salle_repos {ec…

cao_bim_cave_vin

Appelez quand vous devez VERIFIER LA CAVE A VIN : climatisation/temperature (CW-CLIMATISATION), hygrometrie (CW-HYGROMETRIE), eclairage adapte (CW-ECLAIRAGE), securite/acces (CW-SECURITE). scene : cav…

cao_bim_atelier

Appelez quand vous devez VERIFIER L'ATELIER / local technique bricolage : ventilation (ATL-VENTILATION), alimentation electrique (ATL-ELECTRICITE), eclairage (ATL-ECLAIRAGE), securite/EPI (ATL-SECURIT…

cao_bim_office

Appelez quand vous devez VERIFIER L'OFFICE / CAFETERIA (tertiaire) : evier/point d'eau (OF-EVIER), refrigeration (OF-REFRIGERATION), ventilation (OF-VENTILATION), revetement (OF-REVETEMENT). scene : o…

cao_bim_bibliotheque

Appelez quand vous devez VERIFIER LA BIBLIOTHEQUE / salle de lecture : eclairage (BI-ECLAIRAGE), acoustique (BI-ACOUSTIQUE), mobilier/rayonnages (BI-MOBILIER), ventilation (BI-VENTILATION). scene : bi…

cao_bim_vestiaires

Appelez quand vous devez VERIFIER LES VESTIAIRES / locaux de change : bancs (VE-BANCS), casiers (VE-CASIERS), ventilation (VE-VENTILATION), sanitaires/douches (VE-SANITAIRES). scene : vestiaires {banc…

cao_bim_sauna_hammam

Appelez quand vous devez VERIFIER LE SAUNA / HAMMAM : etancheite (SH-ETANCHEITE), ventilation (SH-VENTILATION), chauffage/production vapeur (SH-CHAUFFAGE), securite thermostat/arret (SH-SECURITE). sce…

cao_bim_salle_sport

Appelez quand vous devez VERIFIER LA SALLE DE SPORT / FITNESS : ventilation (SP-VENTILATION), sol amortissant (SP-SOL), equipements certifies (SP-EQUIPEMENTS), securite/issues (SP-SECURITE). scene : s…

cao_bim_local_archives

Appelez quand vous devez VERIFIER LE LOCAL D'ARCHIVES / stockage : protection feu (LA-FEU), acces/controle (LA-ACCES), climatisation/hygrometrie (LA-CLIMATISATION), rayonnage/stockage (LA-RAYONNAGE). …

cao_bim_local_serveur

Appelez quand vous devez VERIFIER LE LOCAL SERVEUR / informatique : climatisation/refroidissement (LS-CLIMATISATION), alimentation/onduleur (LS-ALIMENTATION), securite incendie/controle d'acces (LS-SE…

cao_bim_salle_reunion

Appelez quand vous devez VERIFIER LA SALLE DE REUNION (tertiaire) : eclairage (SR-ECLAIRAGE), ventilation/climatisation (SR-VENTILATION), acoustique (SR-ACOUSTIQUE), equipements ecran/visio (SR-EQUIPE…

cao_bim_coursives

Appelez quand vous devez VERIFIER LES COURSIVES / GALERIES de circulation : structure (CS-STRUCTURE), garde-corps (CS-GARDE-CORPS), etancheite/evacuation EP (CS-ETANCHEITE), eclairage (CS-ECLAIRAGE). …

cao_bim_monte_charges

Appelez quand vous devez VERIFIER LES MONTE-CHARGES / ascenseurs de service : charge nominale (MC-CHARGE), dimension/acces (MC-DIMENSION), securite portes/arret (MC-SECURITE), maintenance/controle (MC…

cao_bim_sas_entree

Appelez quand vous devez VERIFIER LE SAS D'ENTREE / VESTIBULE : etancheite a l'air (SA-ETANCHEITE-AIR), double porte/sas (SA-DOUBLE-PORTE), eclairage (SA-ECLAIRAGE), accessibilite/largeur (SA-ACCESSIB…

cao_bim_brise_vue

Appelez quand vous devez VERIFIER LES BRISE-VUE / CLAUSTRAS : structure (BV-STRUCTURE), fixation (BV-FIXATION), materiau (BV-MATERIAU), opacite/ventilation (BV-OPACITE). scene : brise_vue {structure, …

cao_bim_bornes_recharge

Appelez quand vous devez VERIFIER LES BORNES DE RECHARGE VE (IRVE) : alimentation/puissance (BR-ALIMENTATION), protection differentiel/disjoncteur (BR-PROTECTION), emplacement/accessibilite (BR-EMPLAC…

cao_bim_dispositifs_anti_chute

Appelez quand vous devez VERIFIER LES DISPOSITIFS ANTI-CHUTE : ligne de vie/ancrages (AC-LIGNE-VIE), fixation a la structure (AC-FIXATION), acces securise (AC-ACCES), controle/entretien (AC-CONTROLE).…

cao_bim_arrosage

Appelez quand vous devez VERIFIER LE RESEAU D'ARROSAGE (espaces verts) : reseau (AR-RESEAU), programmateur/vannes (AR-PROGRAMMATEUR), recuperation EP (AR-RECUPERATION), protection antigel (AR-ANTIGEL)…

cao_bim_cours_patio

Appelez quand vous devez VERIFIER LES COURS / PATIOS : revetement (CR-REVETEMENT), drainage/evacuation EP (CR-DRAINAGE), eclairage (CR-ECLAIRAGE), accessibilite/cheminement (CR-ACCESSIBILITE). scene :…

cao_bim_local_compost

Appelez quand vous devez VERIFIER LE LOCAL COMPOST (aire de compostage) : emplacement (LC-EMPLACEMENT), aeration/ventilation (LC-AERATION), acces (LC-ACCES), protection nuisibles/intemperies (LC-PROTE…

cao_bim_terrain_sport

Appelez quand vous devez VERIFIER LE TERRAIN DE SPORT (aires sportives) : revetement (TS-REVETEMENT), marquage/equipements (TS-MARQUAGE), drainage (TS-DRAINAGE), cloture/protection (TS-CLOTURE). scene…

cao_bim_conciergerie

Appelez quand vous devez VERIFIER LA CONCIERGERIE / LOGE : acces/visibilite (CI-ACCES), sanitaire/point d'eau (CI-SANITAIRE), comptage/tableaux (CI-COMPTAGE), confort chauffage/ventilation (CI-CONFORT…

cao_bim_salle_commune

Appelez quand vous devez VERIFIER LA SALLE COMMUNE : acces (SC-ACCES), eclairage naturel/artificiel (SC-ECLAIRAGE), ventilation (SC-VENTILATION), securite incendie/isses (SC-SECURITE). scene : salle_c…

cao_bim_aires_jeux

Appelez quand vous devez VERIFIER LES AIRES DE JEUX (gestion locative) : sol amortissant NF EN 1177 (AJE-SOL), equipements certifies NF EN 1176 (AJE-EQUIPEMENTS), cloture/protection (AJE-CLOTURE), ent…

cao_bim_local_deux_roues

Appelez quand vous devez VERIFIER LE LOCAL DEUX-ROUES MOTORISES : ventilation (DR-VENTILATION), extincteur/protection feu (DR-FEU), acces (DR-ACCES), fixation/stationnement (DR-FIXATION). scene : loca…

cao_bim_buanderie

Appelez quand vous devez VERIFIER LA BUANDERIE / LAVERIE : machines lave-linge/seche-linge (BU-MACHINES), ventilation (BU-VENTILATION), evacuation EP (BU-EVACUATION), revetement sols/murs (BU-REVETEME…

cao_bim_portails

Appelez quand vous devez VERIFIER LES PORTAILS MOTORISES : motorisation (PL-MOTORISATION), securite detection/force NF EN 12453 (PL-SECURITE), alimentation/deverrouillage (PL-ALIMENTATION), signalisat…

cao_bim_boites_aux_lettres

Appelez quand vous devez VERIFIER LES BOITES AUX LETTRES (gestion locative) : emplacement/acces (BL-EMPLACEMENT), nombre de boites (BL-NOMBRE), eclairage (BL-ECLAIRAGE), protection intemperies/securit…

cao_bim_abris_jardin

Appelez quand vous devez VERIFIER LES ABRIS DE JARDIN (annexes legeres) : structure (AJ-STRUCTURE), ancrage/fondation (AJ-ANCRAGE), couverture (AJ-COUVERTURE), acces/portes (AJ-ACCES). scene : abris_j…

cao_bim_serres_verandas

Appelez quand vous devez VERIFIER LES SERRES / VERANDAS (extensions vitrees) : structure (SV-STRUCTURE), vitrage (SV-VITRAGE), ventilation (SV-VENTILATION), etancheite/evacuation EP (SV-ETANCHEITE). s…

cao_bim_porches

Appelez quand vous devez VERIFIER LES PORCHES d'entree : structure (PR-STRUCTURE), couverture (PR-COUVERTURE), etancheite (PR-ETANCHEITE), acces (PR-ACCES). scene : porches {structure, couverture, eta…

cao_bim_piscines

Appelez quand vous devez VERIFIER LES PISCINES : etancheite liner/beton (PI-ETANCHEITE), filtration/traitement (PI-FILTRATION), securite barriere NF P90-306 (PI-SECURITE), plage/margelle/acces (PI-PLA…

cao_bim_murets

Appelez quand vous devez VERIFIER LES MURETS (cloture / soutenement leger) : fondation/semelle (MR-FONDATION), hauteur/stabilite (MR-HAUTEUR), couronnement/chapeau (MR-COURONNEMENT), drainage/joints (…

cao_bim_pergolas

Appelez quand vous devez VERIFIER LES PERGOLAS (structures d'ombrage) : structure poteaux/poutres (PE-STRUCTURE), fixation/ancrage (PE-FIXATION), ombrage lames/toile (PE-OMBRAGE), charges vent/neige (…

cao_bim_carports

Appelez quand vous devez VERIFIER LES CARPORTS (abris voitures) : structure (CP-STRUCTURE), couverture (CP-COUVERTURE), ancrage/fondations (CP-ANCRAGE), degagement/acces (CP-DEGAGEMENT). scene : carpo…

cao_bim_terrasses_bois

Appelez quand vous devez VERIFIER LES TERRASSES BOIS (platelages sur plots) : plots/structure (TB-PLOTS), lames essence/traitement (TB-LAMES), fixation visserie inox (TB-FIXATION), ventilation/lame d'…

cao_bim_auvents

Appelez quand vous devez VERIFIER LES AUVENTS / MARQUISES : fixation a la structure (AU-FIXATION), etancheite/descente EP (AU-ETANCHEITE), charges neige/vent (AU-CHARGES), securite hauteur/debord (AU-…

cao_bim_caves

Appelez quand vous devez VERIFIER LES CAVES / CELLIERS (locaux enterres / stockage) : ventilation (CV-VENTILATION), etancheite murs/dalle (CV-ETANCHEITE), acces (CV-ACCES), electricite/eclairage (CV-E…

cao_bim_local_entretien

Appelez quand vous devez VERIFIER LE LOCAL D'ENTRETIEN / MENAGE : evier/vidoir (LE-EVIER), ventilation (LE-VENTILATION), revetement sols/murs (LE-REVETEMENT), acces/rangement (LE-ACCES). scene : local…

cao_bim_bandeaux

Appelez quand vous devez VERIFIER LES BANDEAUX / CORNICHES de facade : fixation a la structure (BA-FIXATION), etancheite/larmier (BA-ETANCHEITE), isolation (BA-ISOLATION), joints de dilatation (BA-DIL…

cao_bim_cheneaux_gouttieres

Appelez quand vous devez VERIFIER LES CHENEAUX / GOUTTIERES (evacuation EP en toiture) : pente (CG-PENTE), section/dimensionnement (CG-SECTION), descentes EP (CG-DESCENTES), trop-plein/debordement (CG…

cao_bim_appuis_seuils

Appelez quand vous devez VERIFIER LES APPUIS ET SEUILS (appuis de baie / seuils) : rejingot/releve (AP-REJINGOT), pente/debord (AP-PENTE), etancheite (AP-ETANCHEITE), rupture de pont thermique (AP-RPT…

cao_bim_garanties

Appelez quand vous devez VERIFIER LES GARANTIES LEGALES (EXE/juridique) : decennale (GA-DECENNALE), biennale (GA-BIENNALE), parfait achevement (GA-PARFAIT), assurance DO/RC (GA-ASSURANCE). scene : gar…

cao_bim_chainages

Appelez quand vous devez VERIFIER LES CHAINAGES (maconnerie armee) : position horizontaux+verticaux (CH-POSITION), continuite (CH-CONTINUITE), section (CH-SECTION), ancrage/liaison (CH-ANCRAGE). scene…

cao_bim_murs_pignons

Appelez quand vous devez VERIFIER LES MURS PIGNONS (facades laterales) : stabilite au vent (PG-STABILITE), ancrage a la structure (PG-ANCRAGE), isolation (PG-ISOLATION), etancheite/protection (PG-ETAN…

cao_bim_sols_souples

Appelez quand vous devez VERIFIER LES SOLS SOUPLES (revetements PVC/linoleum) : support/ragreage (SS-SUPPORT), sous-couche (SS-SOUS-COUCHE), soudure des les/joints (SS-SOUDURE), hygrometrie du support…

cao_bim_quincaillerie

Appelez quand vous devez VERIFIER LA QUINCAILLERIE (equipement des menuiseries) : serrure/cylindre (QU-SERRURE), ferme-porte (QU-FERME-PORTE), paumelles/charnieres (QU-PAUMELLES), securite anti-pince-…

cao_bim_carrelage

Appelez quand vous devez VERIFIER LE CARRELAGE (revetements carreles sols/murs) : support/primaire (CA-SUPPORT), colle/mortier-colle (CA-COLLE), joints (CA-JOINTS), planeite du support (CA-PLANEITE). …

cao_bim_parquet

Appelez quand vous devez VERIFIER LE PARQUET (revetements de sol bois) : support/sous-couche (PQ-SUPPORT), essence (PQ-ESSENCE), mode de pose colle/cloue/flottant (PQ-POSE), joints de dilatation/hygro…

cao_bim_faux_plafonds

Appelez quand vous devez VERIFIER LES FAUX PLAFONDS (plafonds suspendus) : ossature suspentes/fourrures (FP-OSSATURE), plaques (FP-PLAQUES), hauteur/vide technique (FP-HAUTEUR), trappes d'acces (FP-AC…

cao_bim_planchers_techniques

Appelez quand vous devez VERIFIER LES PLANCHERS TECHNIQUES (faux planchers sureleves) : verins/supports (PT-VERINS), dalles amovibles (PT-DALLES), hauteur du vide technique (PT-HAUTEUR), acces/trappes…

cao_bim_predalles

Appelez quand vous devez VERIFIER LES PREDALLES (planchers a predalles prefabriquees) : dalle de compression >= 4 cm (PD-DALLE), treillis soudes (PD-TREILLIS), appuis (PD-APPUIS), etaiement (PD-ETAIEM…

cao_bim_menuiseries_pvc

Appelez quand vous devez VERIFIER LES MENUISERIES PVC (fenetres/portes) : profile (MP-PROFIL), vitrage (MP-VITRAGE), etancheite joints (MP-ETANCHEITE), certification NF/CE (MP-CERTIFICATION). scene : …

cao_bim_parametres

Appelez quand vous devez VERIFIER LES PARAMETRES D'OBJET (qualite des donnees LOI) : classification (PA-CLASSIFICATION), materiau (PA-MATERIAU), reference (PA-REFERENCE), marquage/identifiant (PA-MARQ…

cao_bim_nomenclature

Appelez quand vous devez VERIFIER UNE NOMENCLATURE (metres) : quantites (NM-QUANTITE), unites (NM-UNITE), lot (NM-LOT), reference (NM-REFERENCE). scene : nomenclature {quantite, unite, lot, reference}…

cao_bim_poteaux

Appelez quand vous devez VERIFIER LES POTEAUX (elements porteurs verticaux) : section (PO-SECTION), elancement <= 70 (PO-ELANCEMENT), armatures (PO-ARMATURES), stabilite au feu (PO-FEU). scene : potea…

cao_bim_poutres_beton

Appelez quand vous devez VERIFIER LES POUTRES BETON (elements porteurs horizontaux) : section (PB-SECTION), portee (PB-PORTEE), armatures travees/appuis (PB-ARMATURES), fleche verifiee (PB-FLECHE). sc…

cao_bim_semelles

Appelez quand vous devez VERIFIER LES SEMELLES DE FONDATION (fondations superficielles) : dimensions (SE-DIMENSION), profondeur d'assise hors gel >= 0.5 m (SE-PROFONDEUR), armatures (SE-ARMATURES), an…

cao_bim_longrines

Appelez quand vous devez VERIFIER LES LONGRINES (poutres de liaison au sol) : section (LG-SECTION), armatures (LG-ARMATURES), liaison semelles/poteaux (LG-LIAISON), niveau d'assise/calage (LG-NIVEAU).…

cao_bim_tolerances

Appelez quand vous devez VERIFIER LES TOLERANCES D'EXECUTION (EXE) : planeite <= 7 mm (TL-PLANEITE), verticalite/aplomb <= 3 mm/m (TL-VERTICALITE), alignement <= 5 mm (TL-ALIGNEMENT), ecart de niveau …

cao_bim_methodologie

Appelez quand vous devez VERIFIER LA METHODOLOGIE D'EXECUTION (preparation des travaux) : mode operatoire (ME-MODE-OPERATOIRE), phasage (ME-PHASAGE), controles/autocontroles (ME-CONTROLES), securite P…

cao_bim_assemblages_acier

Appelez quand vous devez VERIFIER L'ASSEMBLAGE ACIER (connexions metalliques) : boulons classe/type (AS-BOULONS), couple de serrage/precontrainte (AS-SERRAGE), soudures type+controle (AS-SOUDURES), pl…

cao_bim_poutres_lamelle_colle

Appelez quand vous devez VERIFIER LES POUTRES LAMELLE-COLLE (bois massif reconstitue) : section/portee (PLC-SECTION), classe de resistance GL24h/GL28h (PLC-CLASSE), protection humidite/feu (PLC-PROTEC…

cao_bim_cartouches

Appelez quand vous devez VERIFIER LE CARTOUCHE DE PLAN (habillage, auteur) : projet (CA-PROJET), echelle (CA-ECHELLE), indice de revision/date (CA-REVISION), emetteur auteur/verificateur (CA-EMETTEUR)…

cao_bim_fiche_fabricant

Appelez quand vous devez VERIFIER LA FICHE FABRICANT (documentation fournisseur) : fabricant (FF-FABRICANT), reference produit (FF-REFERENCE), garantie (FF-GARANTIE), SAV/contact (FF-SAV). scene : fic…

cao_bim_installation_chantier

Appelez quand vous devez VERIFIER L'INSTALLATION DE CHANTIER (PIC) : cloture/limites (PIC-CLOTURE), acces (PIC-ACCES), base vie (PIC-BASE-VIE), levage/stockage (PIC-LEVAGE). scene : installation_chant…

cao_bim_avis_technique

Appelez quand vous devez VERIFIER L'AVIS TECHNIQUE / CERTIFICATION d'un produit ou fabricant : produit (AT-PRODUIT), avis technique/ATE/DTA (AT-AVIS), marquage CE (AT-MARQUAGE), fabricant identifie (A…

cao_bim_ossature_acier

Appelez quand vous devez VERIFIER L'OSSATURE ACIER (structure metallique) : systeme declare (OS-SYSTEME), profiles HEA/IPE/HEB (OS-PROFILES), protection au feu SF (OS-PROTECTION-FEU), assemblages boul…

cao_bim_plancher_collaborant

Appelez quand vous devez VERIFIER LE PLANCHER COLLABORANT (mixte acier-beton) : bac acier (PC-BAC), epaisseur beton >= 6 cm (PC-BETON), connecteurs goujons (PC-CONNECTEURS), portee verifiee (PC-PORTEE…

cao_bim_contreventement

Appelez quand vous devez VERIFIER LE CONTREVENTEMENT (stabilite structurale) : systeme declare (CT-SYSTEME), deux directions orthogonales (CT-DIRECTIONS), efforts horizontaux vent/seisme (CT-EFFORTS),…

cao_bim_ancrages

Appelez quand vous devez VERIFIER LES ANCRAGES (liaisons et fixations structurales) : type declare (AN-TYPE), capacite verifiee en kN (AN-CAPACITE), nombre par appui >= 2 (AN-NOMBRE), protection corro…

cao_bim_parking_velos

Appelez quand vous devez VERIFIER LE STATIONNEMENT VELOS (VRD) : places >= 1 (PV-PLACES), abri (PV-ABRI), fixation arceaux (PV-FIXATION), acces (PV-ACCES). scene : parking_velos {places, abri, fixatio…

cao_bim_local_poubelles

Appelez quand vous devez VERIFIER LE LOCAL POUBELLES (VRD, reglement sanitaire) : ventilation (LP-VENTILATION), point d'eau (LP-EAU), dimensionnement selon logements (LP-DIMENSION), acces a la collect…

cao_bim_lots

Appelez quand vous devez decouper un chantier : repartir les elements d'une scene en lots (gros oeuvre, enveloppe, second oeuvre, MEP, finitions) ou agreger plusieurs batiments (quantitatif + cout cum…

cao_bim_note

Appelez quand vous devez generer la note de calcul synthetique d'un projet BIM : reglementation du terrain, bilan BIM (LOD/LOI, conformite), statut de signature et limites indicatives. format=pdf rend…

irl_revision_loyer

QUAND un bail arrive à sa date anniversaire et que le loyer peut être révisé. Révision annuelle d'un loyer d'habitation indexée sur l'IRL (art. 17-1 loi 89-462). Fournir le loyer actuel et le trimestr…

regularisation_charges

QUAND l'exercice de charges est clos et qu'il faut solder les provisions — en gérance (par locataire) comme en copropriété (par tantièmes de lot). Régularisation annuelle des charges locatives (décret…

regularisation_charges_rgdd

QUAND le syndic a envoyé son RGDD (relevé général des dépenses) et qu'il faut établir le décompte de charges d'UN locataire. Traite chaque bloc du RGDD tel qu'il est imprimé, avec ses deux colonnes (à…

quittance_loyer

QUAND le loyer a été PAYÉ et que le locataire demande sa quittance — jamais avant encaissement (art. 21). Génère une quittance de loyer conforme (art. 21 loi 89-462), HTML imprimable renvoyé en HTML c…

cao_generer_dxf

WHEN the drawing must leave as a real CAD file, openable by an architect or a draughtsman. Draw a building scene and get an AutoCAD DXF. Call cao_verifier first to catch geometry mistakes. Scene schem…

cao_generer_ifc

WHEN the drawing must leave as a real BIM file, openable in Revit/ArchiCAD/Solibri — not just a drawing. Draw a building scene and get an IFC4 file in millimetres: real spatial hierarchy (project/site…

cao_valider_ifc

WHEN you need to check an IFC scene without a buildingSMART account. Same scene as cao_generer_ifc. Returns {ok, schema_ifc4, regles, problemes}: IFC4 schema + EXPRESS rules, millimetre units, materia…

cao_conflits_ifc

WHEN coordinating a BIM model: detect real clashes — solids that interpenetrate by more than 10 mm and 0.1 L, computed on volumes (horizontal slices of each mesh), so two tables nested at the same lev…

cao_bcf_ifc

WHEN clashes and control alerts must leave as a BCF 2.1 zip readable in Solibri, BIMcollab, Navisworks, Revit or Archicad: one Clash topic per clash and one Issue topic per alert of our checks, each s…

cao_regles_structure_reseaux

WHEN a building scene must be completed with structure and building services by French rules before BIM export or quoting: lintels over openings of load-bearing walls, strip footings sized from servic…

cao_copilote

WHEN a user asks to change an existing building scene in plain words — « agrandis la cuisine d'un mètre », « réduis la chambre 2 de 50 cm côté nord », move a wall, widen a door, move or rotate furnitu…

cao_familles

WHEN you place doors or windows in a scene and want real, orderable joinery instead of free-size holes: lists the parametric families (hinged door in the French 63/73/83/93 series, double, sliding, po…

cao_ids_verifier

WHEN a BIM manager's information requirements (an IDS 1.0 file, buildingSMART) must be checked on a model before delivery — ours built from the scene, or an architect's IFC: checks every specification…

cao_importer_ifc

WHEN an architect sends an IFC (Revit, Archicad… IFC2X3 or IFC4) and you must check it with our rules: converts the IFC text into a CAO scene — walls, doors and windows on their host wall, straight st…

cao_metres

WHEN you need FIGURES from a design — to price a job, order materials, or check a quote. Compute quantities (metrés) from a CAO scene. Also returns alertes[] from the geometry audit — fix critical ale…

cao_rendu

WHEN you want to SEE the plan before delivering it — a quick visual check that the scene is what you meant. Top-down preview of a CAO scene. Prefer cao_verifier before this for structured alerts; use …

cao_pdf

WHEN the design must be HANDED OVER to a client, an architect or a planning office. Generate a professional TECHNICAL SHEET from a CAO scene: top view, elevations, shaded axonometric, optional MEP pla…

cao_programme

WHEN you are asked to DESIGN a house from a brief ('3 bedrooms, open kitchen, 90 m²') rather than to check or edit an existing scene. Returns a complete single-storey house scene — walls, doors, windo…

cao_re2020

WHEN a house design needs an early THERMAL sanity check before the regulatory RE 2020 study (French energy and carbon rules for new buildings). Computes from the CAO scene: envelope areas and U-values…

cao_4d

WHEN the building must be shown AS IT WILL BE BUILT over time (4D, as Navisworks links a model to a schedule): every element belongs to a trade (load-bearing walls to structural works, roof to roofing…

cao_famille_essayer

WHEN a custom parametric object is needed that no catalogue has (a made-to-measure shelf, a counter, a pergola, a technical box): try a family DEFINED AS DATA, like a Revit family — typed and bounded …

cao_ferraillage

WHEN a house design needs its STRUCTURAL pre-design: the load path of every load-bearing wall (dead and live loads separated, SLS and ULS combinations, soil pressure against the allowable value) and s…

cao_carnet

WHEN a house design must be ISSUED as a drawing set (a Revit-style sheet set), for a client, a planning application or a contractor. Builds numbered A3 or A1 sheets: cover with sheet list, site plan, …

cao_nomenclatures

WHEN someone needs the SCHEDULES of a house design, as Revit calls them: the door and window schedule (one mark per type, P1 for doors and F1 for windows, with size, sill height, leaves, clear opening…

cao_energie

WHEN someone asks what a house will COST TO RUN, what it costs the climate, or whether it will overheat in summer. From the CAO scene: the heating need by the degree-day method (envelope and ventilati…

cao_urbanisme

WHEN a design must be checked against the LOCAL PLANNING RULES of its zone (French PLU) before a building-permit application. Measures on the CAO scene: site area, footprint and its percentage, floor …

cao_soleil

WHEN a design decision depends on the SUN: how many hours of direct sunlight each window actually receives, where the building casts its shadow on the plot, and whether a neighbouring building or scre…

cao_devis

WHEN a client or a contractor needs the QUANTITIES to price a house, trade by trade — the skeleton of a French DPGF. From the CAO scene, completed by the rules if needed: structural works (footings an…

cao_permis

WHEN a detached house is headed for a French BUILDING PERMIT (permis de construire, Cerfa 13406). Drafts the permit file from the CAO scene: the Cerfa figures (surface de plancher per R111-22 — inner …

cao_visite_plan

WHEN the building should be SEEN in motion rather than read on a flat plan — you direct the shot. IMPORTANT: call cao_verifier FIRST and fix every severite=critique (intégrité clos/couvert + escalier/…

cao_mobilier

WHEN you are about to furnish or decorate a scene — call this BEFORE composing `mobilier[]`, and never furnish with `boites[]`. FREE catalogue (no API key, 0 units) of REAL furniture and decoration ob…

cao_visite_camera

WHEN the automatic visit is good but ONE view is wrong — the façade is cut off, the ridge is out of frame, you want to step into the next room — and rewriting a whole `chemin` by hand would be absurd.…

cao_demo

WHEN you are about to draw ANY French building for the first time, or when a user asks for a plan / DXF / IFC and you have not yet used these tools — call this FIRST. It hands back a COMPLETE, ALREADY…

cao_verifier

WHEN a scene is composed and BEFORE cao_pdf / cao_generer_dxf / cao_rendu / cao_visite_plan / cao_visite_studio — the cheap check that stops a wrong plan or broken 4K visit from being delivered. FREE …

bonnes_pratiques

WHEN you discover this server — call it FIRST, before anything else, and again if your cached instructions may be stale. FREE versioned playbook of best practices for MCP/API agents (no API key, 0 uni…

decide_campagne

WHEN an outreach scenario has collected prospects and must decide what to do with each one — Make/n8n collects, Synergieloc decides. Authenticated decision engine for outreach/campaigns (requires API …

obtenir_cle_api

QUAND vous n'avez pas encore de clé — APPELEZ-LE EN PREMIER, il n'y a aucune raison d'attendre. Obtenez une clé API GRATUITE instantanément — AUCUN email requis, aucune attente : idéal pour une IA/age…

guides_liste

QUAND vous ignorez comment une opération se fait dans le logiciel, ou quelle règle métier s'applique. Liste les guides officiels du logiciel Synergieloc (mode d'emploi écran par écran + règles légales…

guide_lire

QUAND guides_liste a rendu un slug pertinent et qu'il faut le contenu complet de la procédure. Lit un guide officiel Synergieloc en Markdown complet (slug obtenu via guides_liste). GRATUIT, aucune uni…

avenant_revision_irl

QUAND la révision IRL est calculée et qu'il faut la NOTIFIER au locataire par courrier. Calculez d'abord avec irl_revision_loyer. Courrier de révision de loyer IRL prêt à envoyer au locataire (HTML im…

avis_echeance

QUAND le bailleur doit APPELER le loyer du mois, AVANT paiement — à ne pas confondre avec quittance_loyer, qui atteste l'encaissement APRÈS coup. Génère un AVIS D'ÉCHÉANCE, renvoyé en HTML complet dan…

relance_impaye

QUAND un loyer reste impayé après l'échéance. Choisissez le niveau 1–5 selon l'ancienneté ; à partir du 3, la mise en demeure engage la procédure. Courrier de RELANCE impayé niveaux 1–5 (amiable → pré…

crg_proprietaire

QUAND il faut rendre compte au propriétaire (fin de trimestre, d'exercice, ou à sa demande). COMPTE RENDU DE GESTION simplifié, renvoyé en HTML complet dans la réponse : ni fichier, ni URL, ni PDF, et…

fiscal_synthese

QUAND un bailleur se demande s'il a intérêt au micro-foncier ou au réel — typiquement à l'approche de la déclaration. INDICATIF. Synthèse fiscale revenus fonciers (INDICATIVE) : compare micro-foncier …

mouvement_locataire

QUAND un locataire ENTRE ou SORT du logement : checklist et solde de tout compte. Document ENTRÉE ou SORTIE locataire (checklist + solde de tout compte). Renvoie le document en HTML complet dans la ré…

edl_etat_des_lieux

QUAND il faut constater l'état du logement, à l'entrée ou à la sortie — pièce indispensable pour retenir sur le dépôt de garantie. État des lieux d'entrée ou de sortie (décret 2016-382). Renvoie l'éta…

bon_intervention

QUAND une réparation doit être commandée à un artisan ou signalée au propriétaire — le bon de commande qui engage la dépense. À distinguer de devis_travaux (on demande un prix, rien n'est commandé) et…

facture_facturx

QUAND une facture doit être conforme à la facturation électronique française (réforme e-facture, EN 16931) — le seul outil de ce serveur qui produise un vrai PDF ; tous les autres documents sortent en…

declaration_paiement

QUAND le client vous dit qu'un loyer a été payé : à appeler AVANT quittance_loyer, pour tracer l'encaissement. Le client confirme si le locataire a payé (date + montant) → proposition d'écriture compt…

mandat_gerance

QUAND un propriétaire confie la gestion de son bien à une agence : c'est le contrat de départ, avant tout le reste. Rédige un MANDAT DE GESTION (loi Hoguet), renvoyé en HTML complet dans la réponse : …

candidature_locataire

QUAND un candidat constitue son dossier pour un logement. Dossier de CANDIDATURE locataire (HTML ; PDF via /api/v1/documents/candidature). Destinataire fenêtre = agence. À classer dans le dossier loca…

annonce_location

QUAND un bien vacant doit être mis en location et qu'il faut rédiger l'annonce. Rédige un BROUILLON d'annonce de location (texte_brut + html). IMPORTANT : aucune publication sur synergieloc.fr via MCP…

envoyer_retour

QUAND un résultat vous semble faux, incomplet, ou qu'un endpoint plante. Gratuit, sans quota, toujours ouvert. Envoyer un retour / suggestion pour améliorer l'application Synergieloc (remarque sur un …

pack_partenaire

WHEN you are helping an artisan or a BTP company and need to know what the Partner Portal already covers — call it first. FREE catalogue of the Partner Portal apps (/portal/tiers/dashboard) mapped to …

fiche_mission

QUAND un artisan prépare une intervention ou un chantier — le cadrage AVANT d'y aller, là où compte_rendu_chantier rend compte APRÈS. Fiche mission / chantier (app Missions). Renvoie la fiche en HTML …

devis_travaux

QUAND un artisan chiffre des travaux AVANT accord du client — rien n'est commandé à ce stade, contrairement à bon_intervention. Devis travaux (app Factures). Renvoie le devis en HTML complet dans la r…

liste_materiaux

QUAND il faut préparer les ACHATS d'un chantier — la liste qu'on emporte chez le fournisseur, pas un chiffrage client : pour cela, devis_travaux. Si la scène est déjà dessinée, cao_metres calcule les …

confirmation_rdv

QUAND un rendez-vous est déjà pris et doit être confirmé par écrit au client — visite, état des lieux, signature de bail. Cet outil ne réserve rien et ne consulte aucun agenda : il rédige la lettre de…

note_frais

QUAND des frais professionnels doivent être remboursés ou justifiés — dépenses réelles sur justificatif, là où journal_kilometrique applique le barème kilométrique. Note de frais (app Frais). Renvoie …

journal_kilometrique

QUAND les déplacements doivent être justifiés au BARÈME kilométrique — pour des frais réels sur justificatif, c'est note_frais. Journal kilométrique + indemnités (app Kilométrique). Renvoie le journal…

compte_rendu_chantier

QUAND il faut rendre compte au maître d'ouvrage de l'avancement d'un chantier après une visite — le document qui trace les réserves et les engage. À distinguer de bon_intervention (on commande une rép…

relance_facture_client

QUAND un artisan n'est pas payé par SON client (BTP). À ne pas confondre avec relance_impaye, qui vise un locataire. Relance facture client BTP (app Factures en retard), niveaux 1–4. Différent de rela…

conformite_artisan

QUAND il faut vérifier qu'un artisan est en règle avant de lui confier un chantier (RC Pro, décennale, URSSAF, KBIS). Checklist conformité artisan (app Conformité) : RC Pro, décennale, URSSAF, KBIS. M…

cao_comparer_versions

WHEN two versions of a house design must be compared: what the client, the architect or another agent changed, and what it changes to the quantities (the basis of a change order). Elements are matched…

cao_fusionner_versions

WHEN two people or agents changed the same house design in parallel, starting from the same version, and both changes must be kept (like synchronising with a Revit central model). Three-way merge, ele…

cao_bibliotheque_familles

WHEN a parametric family (custom shelf, window, bench…) must be reused across projects or shared: the account's family library, like Revit's family library. action=lister: your families then the publi…

cao_familles_recharger

WHEN a scene uses families placed from the library and the library has newer versions: reload them (Revit's Reload Family). Each family with an `origine` moves to its latest version, unless that versi…

cao_integrite

WHEN you need the structural-integrity check alone (is the building really closed and roofed? walls that join nothing, wall clusters scattered outside the envelope, open roof, walls or volumes in each…

cao_documents

WHEN you need the drawing-set completeness check alone: one plan per level, every upper floor reached by a staircase that actually arrives there (or a lift), stairwells protected by guardrails (NF P01…

cao_livrer

WHEN the deliverables of a project must be produced for real (IFC, DXF, drawing sheet, quantities, schedules). Runs the checks FIRST (those of cao_verifier); if any alert is critical, NOTHING is produ…

cao_revue_lots

WHEN a design must be reviewed trade by trade (building envelope and load-bearing walls, openings, floors and roofs, stairs and guardrails, electrical, plumbing, ventilation, furniture and circulation…

immo_proprietaires

WHEN you need the owners (landlords) of the subscriber's SynergieLoc account — a property needs an owner_id. Lists them; with `creer` {first_name, last_name, email?, phone?, address?, postal_code?, ci…

immo_biens

WHEN you need the subscriber's properties (lots). Lists them with owner, rent and status; with `creer` {owner_id, lot_number, property_type (appartement, maison, studio, parking, local…), address?, su…

immo_locataires

WHEN you need the subscriber's tenants. Lists them; with `creer` {first_name, last_name, email?, phone?, civility?, address?, postal_code?, city?} creates one in the account.

immo_baux

WHEN you need the subscriber's leases. Lists them (lot, tenant, rent, status); with `creer` {lot_id, tenant_id, start_date (YYYY-MM-DD), rent, charges?, deposit?, payment_day?, lease_type? (habitation…

immo_appel_loyer

WHEN the rent of a month must be called for a lease: records the rent call (avis d'échéance) in the account, with its accounting entries, like the web app. Nothing is sent to the tenant (see immo_avis…

immo_paiement_enregistrer

WHEN a tenant payment was received: records it in the account (receipt, matching against the open rent calls, owner and fee entries — same logic as the web app). Returns the new tenant balance. Reserv…

immo_impayes

WHEN you need unpaid rent follow-up: rent calls due and not fully paid, per lease and tenant, with amount due, days late and tenant balance. Read only. Reserved to verified companies authorised by Syn…

immo_avis_echeance_envoyer

WHEN ONE rent call must be e-mailed to ITS tenant. Without confirmer: true, returns a preview and sends NOTHING — show it to the user and ask. `destinataire` must be the tenant's e-mail on file. One e…

immo_compte

myide link only. WHEN starting property management for the signed-in myide user: tells whether a SynergieLoc management account exists for their e-mail. If none, with ouvrir_essai: true + societe and,…

tiers_portail

Espace PARTENAIRE SynergieLoc (synergieloc.fr/portal/tiers) de l'utilisateur myide relié : missions, taches, planning (gantt/pert), achats, devis, factures, frais et km, contrat et avenants, consultat…

syndic_coproprietes

QUAND il faut les identifiants d'une copropriété avant d'agir (budget, AG, appels de fonds, état daté, mutation). action « immeubles » : immeubles gérés en syndic ; « sdc » : syndicats de copropriétai…

syndic_budget_previsionnel

QUAND il faut préparer, lire ou faire voter le BUDGET PRÉVISIONNEL d'un syndicat (art. 14-1 loi 1965). Lecture : « lister » (exercices), « lire » (lignes et totaux), « grandes_lignes », « repartition …

syndic_assemblee_generale

QUAND il faut organiser ou suivre une ASSEMBLÉE GÉNÉRALE de copropriété. Lecture : « lister » (AG d'un immeuble ou d'un exercice), « lire » (une AG), « alertes » (AG annuelle manquante, délais de conv…

syndic_appels_de_fonds

QUAND il faut appeler ou suivre les APPELS DE FONDS d'une copropriété. « lister » : appels par SDC, immeuble, exercice, copropriétaire ou statut. Écriture, aperçu puis confirmer: true : « generer_trim…

syndic_etat_date

QUAND un lot est vendu et que le notaire demande le PRÉ-ÉTAT DATÉ ou l'ÉTAT DATÉ (art. 5 décret 1967) : sommes dues par le vendeur, provisions, avances, part de l'acquéreur (art. 6). « apercu » : calc…

syndic_mutation

QUAND la vente d'un lot est signée et qu'il faut faire la MUTATION : le lot passe du vendeur à l'acquéreur à la date de l'acte, les appels à échoir lui sont réaffectés, les impayés antérieurs restent …

syndic_ag_votes

QUAND une AG se tient et qu'il faut compter les VOTES en tantièmes. « presence » : feuille de présence (voix de chacun, réduction art. 22, pouvoirs) ; « resolutions » : résolutions et résultats calcul…

syndic_ag_pv

QUAND il faut établir le PROCÈS-VERBAL d'une AG, à partir de l'ENREGISTREMENT AUDIO de la séance. « transcrire » : envoie l'audio (audio_url https ou audio_base64) ; la transcription horodatée tourne …

demarchage_routes

WHEN you need to operate the Démarchage (prospecting) app: lists its API routes (method, path, summary) so you can call them with demarchage_lire / demarchage_agir. Admin key (myide_) only. Optional `…

demarchage_lire

WHEN you need Démarchage data: GET on a /api/admin/demarchage/… route (overview, leads, suivi, relances, reponses, agenda, publication, meta, google-ads…). Read only. Admin key only.

demarchage_agir

WHEN something must change in Démarchage (add or qualify a lead, contact ONE prospect, send ONE prepared reply, publish ONE post, pause ads, edit the agenda…): POST/PUT/PATCH/DELETE on a /api/admin/de…

cao_gltf

Appelez quand vous devez EXPORTER LA MAQUETTE EN 3D pour un rendu réaliste ou une présentation : glTF 2.0 (Blender, Twinmotion, three.js, Enscape) de l'enveloppe (murs porteurs = structure, cloisons) …

How to use

Claude Desktop or claude.ai: add a custom connector (Customize → Connectors; on Team and Enterprise plans an owner adds it under Organization settings → Connectors) with this server URL: https://synergieloc.fr/mcp

Cursor or Cline: add to your MCP config:

{
  "mcpServers": {
    "fr.synergieloc/immobilier": {
      "url": "https://synergieloc.fr/mcp",
      "transport": "streamable-http"
    }
  }
}